This update summarizes key actions and initiatives from the IEEE Design Automation Standards Committee (DASC) from February to May 2011. Key highlights include the approval of the P1076 (VHDL) and P1076.1 (Analog and Mixed-Signal VHDL) projects by NesCom, successful recirculation ballots for P1076.1.1 (VHDL Extensions) and P1647 (e.language), as well as significant progress for P1666 (SystemC) and P1734 (IP Quality). Additionally, the withdrawal of P1776 (Esterel language) was approved. The report also covers teleconferences held and plans for future meetings.

gaia
Télécharger la présentation

IEEE DASC Update February-May 2011

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. IEEE DASC UpdateFebruary-May 2011 Stan Krolikoski, IEEE DASC Chairman

  2. DASC-sponsored StandardsFebruary-May 2011 Update • P1076 (VHDL) PAR approved by NesCom • P1076.1 (Analog and Mixed-Signal VHDL) PAR approved by NesCom • P1076.1.1 (VHDL Analog and Mixed-Signal VHDL Extensions) Recirculation balloted passed; approved by RevCom • P1647 (e language) Recirculation Ballot passed; On RevCom June agenda • P1666 (SystemC) Initial Ballot passed; In recirculation until May 21 • P1734 (IP Quality) Initial ballot passed with no substantive comments. On June RevCom agenda • P1776 (Esterel language) Withdrawal approved by RevCom

  3. DASC Operations February- May 2011 Update • Teleconferences held on 2/14, 4/7 & 5/5 • Joint face to face & teleconference meeting held on 3/2 in San Jose, CA • Plan to hold joint face to face & teleconference on June 9 in San Diego in conjunction with the Design Automation Conference

  4. DASC P&Ps Updates • P&Ps were revised based on AudCom Sponsor baseline P&Ps • DASC membership approved the revised P&Ps in March • Revised P&Ps uploaded in April for AudCom consideration