1 / 4

HES Status Report 7Oct ’08

HES Status Report 7Oct ’08. EDC1 Wire Study 1. EDC1+2 による FP 分解能. Tight Cut (abs(XFP)<10). No FP Cut. 参考: Wire を f=1 mm, Cu にした場合 Tight Cut で dp /p=2.3 (FWHM). EDC1 Wire Study 2. No Wire 3682. Al Wire 3830. Cu Wire 3781. Summary & Next. EDC1 のワイヤーは Cu+Be で問題なさそう。

Télécharger la présentation

HES Status Report 7Oct ’08

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. HES Status Report7Oct ’08

  2. EDC1 Wire Study 1 EDC1+2によるFP分解能 Tight Cut(abs(XFP)<10) No FP Cut 参考:Wireをf=1mm, Cuにした場合Tight Cutでdp/p=2.3 (FWHM)

  3. EDC1 Wire Study2 No Wire 3682 Al Wire 3830 Cu Wire 3781

  4. Summary & Next • EDC1のワイヤーはCu+Beで問題なさそう。 • EDC1の出発は明日とのこと。Tracking Codeを入手したらメールします。 • 核理研報告書作成中。明日位に一通り終わると思うのでこれもメールします。 • Matrix TuningにSSの部分を入れている。めんどくさい。100%自分で書いたプログラムなのに意味不明(;´Д`) • 金・土はSANEシフト。 ☆OMAKE☆ 動くリス

More Related