1 / 5

LABO CEM Christophe Lemoine

Winter Summary (in preparation for Jan, 20 th , 2010). LABO CEM Christophe Lemoine. LABO CEM - What’s New ?. The Laboratory has moved to a bigger room since end of 2009 3 test benches available Equipment Purchase Oscilloscope Lecroy 2GHz Amplifier Teseq 800 Mhz - 3.1 GHz, 50 W

garron
Télécharger la présentation

LABO CEM Christophe Lemoine

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Winter Summary (in preparation for Jan, 20th, 2010) LABO CEMChristophe Lemoine

  2. LABO CEM - What’s New ? • The Laboratory has moved to a bigger room since end of 2009 • 3 test benches available • Equipment Purchase • Oscilloscope Lecroy 2GHz • Amplifier Teseq 800 Mhz - 3.1 GHz, 50 W • Amplifier Teseq 10MHz - 1GHz, 70 W • Planning Tool • This tool gives a better visibility of laboratory use • Each users can reserve test bench easily • Network. All test bench are connected to INSAT network • Data security. Automatic backup are done • A better data sharing between users • Data are not user-dependant • Accessibility with an INSAT login

  3. LABO CEM – Capability 1/2 Coupling Network • CEM Measurements

  4. LABO CEM – Capability 2/2 • Ageing or temperature investigation with climatic chamber • Board Design with Altium Designer • S parameter measurements with VNA R&S ZVL 6GHz and 6 Coplanar GS probes with pitches from 500 µm to 1.2 mm • IV measurements with precision SourceMeter KEITHLEY • Advanced default monitoring with Lecroy oscilloscope • LT342 500MHz • WaveRunner 204MXi 2GHz • Soldering tool adapted to CMS component

  5. LABO CEM - Prospective 2010 • Purchase • Faraday Cage. 3mx2m for BCI and Emission measurements • BCI measurements • The labo will be able to do BCI measurements with the purchase of the faraday cage and the new amplifier TESEQ • DPI measurements • Improve the repeatability of the Dpi measurements • Upgrade the Bias Tee • Upgrade Power control algorithm • Lab use • Binhong Li - Mixity • ? – EPEA • Christopher Peron – Rosie • Improve Lab visibility • Trainee about characterization of embedded sensor ?

More Related