1 / 25

Presentation by W S (Bill) Cummings

FLINDERS RIVER WATER DEVELOPMENT FORUM HUGHENDEN November 2008 Social & Economic Benefits Study. Presentation by W S (Bill) Cummings.

gaura
Télécharger la présentation

Presentation by W S (Bill) Cummings

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. FLINDERS RIVER WATER DEVELOPMENT FORUMHUGHENDEN November 2008Social & Economic Benefits Study Presentation by W S (Bill) Cummings

  2. BILL CUMMINGS Cummings Economics –– economic aspects.JEFF BENJAMIN North Australia Water Strategies – water aspects.JOHN O’HALLORAN – social aspects STUDY TEAM

  3. 3.7 MEGALITRES A YEAR – SUBSTANTIAL CATCHMENT IN STATE AND NATIONAL TERMS.ONLY A SMALL FRACTION BEING USED. FLINDERS RIVER

  4. RECENT YEARS: • Expansion of small scale usage for irrigation. • Including artesian, farm dams and small instream extraction. TWO MAJOR SCHEMES PROPOSED: • MT BECKFORD – HUGHENDEN. • O’CONNELL CR - RICHMOND.

  5. MT BECKFORD: • SMEC Report 2003. • “In Stream” dam. • 15km east of Hughenden. • Report based on variation of SMEC with 30 - 35m high “in stream” embankment : embankments to Mt Arthur and across Eight Mile Ck. O’CONNELL CREEK: • Offstream storage. Flood harvest. • Gravity diversion from river. • 5m sheet pile weir in the river and excavated channel to storage.

  6. CAPITAL COST & WATER DELIVERED

  7. YIELD & MEAN ANNUAL FLOW

  8. EST. WORKFORCE STRUCTURE McKinlay, Cloncurry, Richmond & Flinders Shires

  9. LONG-TERM POPULATION CHANGES Source : Australian Bureau of Statistics – Census & Other Data.

  10. THREATS TO RAILWAY EMPLOYMENT. • MINING, MAINLY FIFO. • LIMITED OPPORTUNITIES TOURISM. • MAJOR STIMULUS NEEDED.

  11. FACTORS FAVOURABLE TO IRRIGATION: • Small but growing number of local irrigators. • Rail links to largest general cargo port, North Australia. • Tropical agricultural technology improving.

  12. AREA OF IRRIGATED CROPPING IN THE FITZROY BASIN, 2001 a for human consumption. Source : CIE 2001.

  13. ESTIMATED IMPACT OF IRRIGATION SCHEMES Gross Value of Production

  14. OTHER SOURCES OF INCOME COMMUNITY RECREATIONAL TOURISM BENEFITS $10m Estimated Expenditure by Recreation Fishers, Dams South Burnett, Central Q’ld – 2003/04 Source : Press Statement – Q’ld Minister for Primary Industries, 2004.

  15. CONSTRUCTION PHASE Workforce: • FLINDERS SHIRE +20% • RICHMOND SHIRE +40%

  16. IMPACTS ON AGRICULTURE

  17. SOCIAL STRUCTURE • Populations declining • Incomes above state average • Housing costs lower • Unemployment low • Indigenous Flinders 7% Richmond 3% • Average age 35 • High Australian born • Education levels lower • High proportion of managers and admin • High proportion agriculture & transport

  18. SOCIAL IMPACTS • Small number of properties flooded • Sites close to towns already existing infrastructure & services • Found very strong support in communities • Improved business viability, services, new recreational benefits • Consistent with community capacity building initiatives • Indigenous organisations support

  19. HUGHENDEN & RICHMOND • Social infrastructure (health, education, public safety, transport), capacity to absorb increase in population especially in terms of available buildings. • Lag time in government agency responses need to be addressed. • Address construction and seasonal worker fluctuation.

  20. LAND AND DWELLING PRICES LOW. • FLINDERS SEWERAGE UPGRADE NEEDED OTHERWISE NO CONSTRAINTS TO EXPANSION. • PUBLIC HOUSING – TEMPORARY ACCOMMODATION DURING CONSTRUCTION.

  21. Strong local job opportunities. • Existing local skills. • Vacant land and buildings. • Strategy for technical expertise & support for irrigators. • Report lists strategies – maximise benefits, minimise any negatives.

  22. CHANGES SINCE THEN • NOT A GREAT DEAL IN BASIC SITUATION. • INCREASED COSTS OF FUEL, INPUTS AND EXCHANGE RATE, BUT RECENT CHANGES. • FUEL PUMPING COSTS HIGHER. • BIOFUEL CROPS (?) • SECOND CROPS (?)

  23. www.cummings.net.au

More Related