U.S. Brazil Collaborative Program E3

B. R. I. C. 金. 四. U.S. Brazil Collaborative Program E3. What is E3. E3 stands for E nergy, E conomy, E nvironment E3 is a coordinated initiative that is designed to help communities work with their manufacturing base to focus on and offer solutions for improved sustainability.

gemma-cantu
Télécharger la présentation

U.S. Brazil Collaborative Program E3

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. B R I C 金 四 U.S. Brazil Collaborative Program E3

  2. What is E3 • E3 stands for Energy, Economy, Environment • E3 is a coordinated initiative that is designed to help communities work with their manufacturing base to focus on and offer solutions for improved sustainability. • E3 provides manufacturers with customized hands on assessments of production processes which identify opportunities in the areas of: • energy consumption reduction • carbon footprint minimization • pollution prevention • production efficiency • business growth • business costs

  3. Typical E3 Schedule • 11 Weeks to complete assessment • 6 months of follow up to facilitate implementation metrics

  4. E3 Results: Columbus Ohio Pilot PILOT COMPANIES AGGREGATED RESULTS Identified recurring savings - Annualized Energy Savings - $1.7 MM Environmental Savings - $2.6 MM Lean Savings - $1.033 MM Water pollutants avoided – 257,000 pounds CO2 emissions avoided – 19,000 tonnes SOx Reduction – 215 tonnes Solid waste reduction – 24,000 pounds Realized savings – Annualized $1,050,000 implemented or committed since project began – about $175,000 per company 9,457 tonnes of GHG avoided annually TechSolve has conducted six additional assessments since the beginning of 2010 and has received a contract for as many as 25 additional assessments

  5. GROUPS involved in 2010 E3 Assessment Evaluation Methods / Templates Contacts for program continuation E3 Training InitialE3 Evaluations Program Guidance E3 Program Continuation in Brazil

  6. E3: BRIC Observation Exercise During the week of September 27th, a total of eight individuals [delegation], four from Eletrobras, two of the Federal Universities and two of the SEBRAEs (similar to US SBA) observed an E3 evaluation at Vertis Communications [manufacturer], a 220 employee commercial printing facility with a demand of 3000Kw, served by AEP Ohio. The evaluators were from the DOE’s Industrial Assessment Center located at the University of Dayton and the DOC’s Manufacturing Extension Partnership, TechSolve. During the October 1st meeting, participants included representatives from the delegation, USEPA, USDOE, AEP, Duke Energy, Vertis Communications and NIST MEP.

  7. E3: Vertis Communications - Energy

  8. Observing, Analyzing, Brainstorming… The Brazilian Delegation partakes in an E3 evaluation at Vertis Communications

  9. E3: Vertis Communications - Energy Exemplary practices identified: 8 Energy savings opportunities identified: 23 Key potential savings: • Use compressor waste heat for seasonal heating • Install variable speed drives on trim collector fans to reduce motor energy and heating costs • Use existing heat exchanger and cooling tower to reduce chiller run time in cold weather • Use heated regenerative thermal oxidizer exhaust • vent air for dryers • power generation using organic Rankine cycle • Filter and return trim exhaust air to building

  10. E3: Vertis Communications Economy and Environment Two day value stream map event

  11. E3: Vertis Communications Economy and Environment Waste walk

  12. E3: Vertis Communications Economy and Environment Improvement opportunities: 39 Just do its: 11 Key potential savings: • Improve paper acquisition logistics • Reduce packaging losses • Improve layout and material handling • Improve dust control • Investigate key process changes • UV inks • Digital press for small runs Brazilian delegation became part of assessment team and offered suggestions and recommendations

  13. E3: Energy Evaluation (feedback) Premise & method: Energy evaluations will identify savings available from energy efficiency improvements and waste minimization. This is accomplished through using data, engineering methods and detailed analysis. Manufacturers will be provided performance improvement estimations and payback times. Delegation experiences & conclusions: • Multi skill set integrated approach (University perspective) • Quick solution for manufacturers • Manufacturer was engaged • Combination of utility, university, consulting company worked well • Focus on client needs and perspective • Integrated several engineering disciplines

  14. E3: Energy Evaluation (feedback) Premise & method: Energy evaluations will identify savings available from energy efficiency improvements and waste minimization. This is accomplished through using data, engineering methods and detailed analysis. Manufacturers will be provided performance improvement estimations and payback times. Manufacturer experiences & conclusions: • Facilitation was a plus • Participation of delegation from Brazil • Trained and experienced facilitators was invaluable • Fresh set of eyes was beneficial • Financial results appear consistent with pilot values

  15. E3: Lean and Clean Review (feedback) Premise & method: This review evaluates a manufacturer for potential areas of waste in manufacturing processes. This is accomplished through reviews performed by walkthroughs, interviews and process mapping. Delegation experiences & conclusions: • Collaborative approach including manufacturer • Done with customer not to customer • Motivation for implementation – ownership of results Manufacturer experiences & conclusions: • Helping Vertis to help itself • Enabled Vertis to see the waste • Limited staff – normally no resources for this type of event • Lean and clean opportunities consistent with pilot results

  16. E3: GHG Emissions Training (feedback) Premise & method: A third component of the E3 evaluation is the training of the manufacturer on how to calculate their GHG emissions. In addition to the training, documents are provided to assist the manufacturer in planning the reduction of these emissions. Baseline carbon footprint will be done post event. Delegation experiences & conclusions: The GHG Emissions training portion of the E3 evaluation was not observed by the delegation. • Considered absolutely important • Need training on tools • Needs adaptation, but tool is very flexible Manufacturer experiences & conclusions: • Is an important component that requires follow up and subsequent calculations & data entry into EPA spreadsheets

  17. Conclusions – Vertis Assessment • The delegation, with Eletrobras as both a company and the Brazilian agency mandated for Energy Efficiency program implementation, believes E3 BRIC will be a valuable addition to its portfolio of actions to improve its commercial and industrial electricity users’ efficiency and environmental performance. • Eletrobras sees this as an opportunity to gather partners and further expand energy efficiency policies and activities in Brazil. • Vertis Communications is pleased to know how it can become more energy efficient and reduce its environmental footprint. Vertis recommends that other Commercial and Industrial electricity users participate in the E3 program. • US Federal agencies recognize this week’s progress and will assist and support the furtherance of E3 programs as appropriate.

  18. Delegation Questions Addressed During October 1st Meeting What is the E3 business model:- what are the costs? Who pays what and whom?- what are the results to date?- what is the overall cost-effectiveness?- what is the overall E3 workflow?Brazil already has the technical expertise. What is the relevance of E3 in the E8? Can you suggest ways for funding for the pilot project in Brazil?

  19. Overall view of E3 • Integrates multiple approaches. • Clearly benefits all the players involved (a win-win relation). • E3 is technically feasible in Brazil with some adjustments to the local reality.

  20. E3: BRIC Next Steps • E3 evaluation observation by Duke team in Ohio – June • E3 evaluations by Duke/Eletrobras team in Brazil – August • Additional training as necessary for Eletrobras team – August • E3 program continuation by Eletrobras

  21. E3 Assessment of Whirlpool - Manaus Facility 5 August, 2011 • Kelly Kissock – University of Dayton • Perry Stephens – Duke Energy • Greg Hume – TechSolve, Inc.

  22. E3 Timeline 2009: Pilots in Ohio and Texas 2010: Brazilian delegation observes E3 assessment in US 2011: Programs in 21 states 2011 Pilot assessment in Manaus, Brazil

  23. Project Team Energy Team Leader Kelly Kissock, University of Dayton Senior Engineers Carlos Aparecido Ferreira, Eletrobras Carlos Henrique Moya, Eletrobras Marcella Fuchs Salmao, Eletrobras Fernando Pinto Dias Perrone, Eletrobras MarcioAmerico, Sebrae-RJ JurimarCollaresIpiranga , Eletrobras Amazonas Energia Sergio Meirelles Pena, Cepel Greg Hume, TechSolve Perry Stephens, Duke Energy University Energy Engineers RogerioDiogne de Souza e Silva, Federal University of Para Vitor da Silva Kataoka, Federal University of Para Antonio Carlos Picanco Jr, Federal University of Para

  24. Energy Assessment Methodology • Establish Energy Baseline • Identify Savings Opportunities • Quantify Savings Opportunities Using Measured Data and Energy Engineering • Report Results

  25. Annual Savings by System

  26. Overall Simple Payback: 7 months

  27. Total Savings: 18.6% of Plant Energy

  28. Lessons Learned • Teams of energy engineers with University students can work with manufacturers over a short period to identify and quantify significant energy savings with good returns on investments. • Most energy saving opportunities are in energy end-uses, not motors and electrical systems.

  29. Lean and Clean Process Review • Work with plant operations • personnel to identify: • Process steps • Material & energy input • Process wastes • Process issues • Improvement ideas

  30. Exemplary Practices Visual management Kaizen Shop

  31. Exemplary Practices Robust recycling program Wastewater management

  32. Observations Distribution piping Disposition of EPS Excessive conveyor wear

  33. Value stream map

  34. Economy & Environment recommendations

  35. NREL: Desiccant-Enhanced eVaporative (DEVap) Timeline: • 2010: Technology announced • Membrane based • Uses liquid desiccant – no CFC/HCFC • 50-80% energy reduction vs. refrigeration technology • 2011: Prototypes in production • 2015: Large CO2 reduction? Recommended action: • Contact DOE to determine availability of technology

  36. Whirlpool Reaction The Whirlpool Plant Manager expressed his appreciation for the energy savings identified by Dr. Kissock’s team and noted that this was a welcome roadmap to help Whirlpool, Manaus continue to compete in the global marketplace. He also noted that the DEVap technology might be a way for Brazil to move much of the manufacturing work back to Manaus from China.

  37. THANK YOU FERNANDO PERRONE FOR MORE INFORMATION www.procelinfo.com.br