An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Suzhou SIP SINOFRENCH Environment Technical Co., Ltd Phase I of Sludge Disposal and Recycling Project Add:Che Guo Dong Rd. Che Fang Town, SIP Tel:0512-62386800 Fax:0512-62386800 Mobile:18261705090

  2. Company Introduction

  3. Company Briefing • Established in:April,2009 • Registered Capital: RMB 8,200 million • Main Business:Sludge Disposal • Waste Treatment • Industrial Waste Water Treatment • Environment Protection eg.Urban Waste Mgt. • Shareholder:CS Public Utilities Development Co.,Ltd • SINO FRENCH Water Co,Ltd

  4. Powerful Parent Company WATER GAS Thermal Power 核心业务 Environment Tech. Energy Services Municipal Engineering Property Development

  5. Powerful Parent Company SINO FRENCH WATER 25 JVs in 18 cities across China, two of which involve sludge

  6. Company Culture Values Pragmatic, Creative, Cooperative, Win-win OurMissionCommitted to sustainable development of China’s Environment Social Responsibilitylow carbon ,harmony and public welfare

  7. Project Introduction Event • Place • Date • Your Name

  8. Project Introduction Project:Phase I of Sludge Disposal and Recycling Project of Suzhou SIP Location:East Che Guo Rd., SIP Main Business: sludge treatment from plant in SIP Capacity:300 tons of dewatered sludge per day Total Investment:216 million RMB Technology :2 phase drying process(Innodry 2E) 3 independent production line (100 ton per) Performance:solid content from 20%to 70-90% Final usage:fuel for power plant mixed with coal

  9. Features and advantages of Sludge Drying • Hazard-free and stabilization • reducing quantity to max extent • energy recycling of dried sludge as biomass • saving large piece of land 3300 kcal / ton useful thermal 90% 0 20% 40% 60% 80% Dry content

  10. wastewater Advanced Technology and Idea (I) Wastewater treatment plant wet sludge recycled water wastewater SIP • Industry Synergy and Recycling Sludge drying plant steam Dry sludge hot water steam Centralized heating/cooling Cogeneration Plant

  11. Advanced Technology and Idea (II) • Energy saving, low consumption, safe and reliable Low consumpiton Saving 30%heat by reusing heat from process 1 in process 2 0.8 ton steam consumption / ton water evaporation Low temperature Sludge contact temperature ≤105℃ Dust free formation of sludge takes place at 55% solids

  12. Result of Energy Conservation and Emission Reduction Water Saving3,844,800t/year Coal Saving15,030t/ year recycled water as cooling medium Carbon Reduction 29,543 tCO2-eq/year Emission Reduction Solid waste 10,000 ton per year Take dry sludge as fuel Hot Water recycling at thermal plant Bottom ash reused as building material saving90,000ton desalinated water per year …

  13. Honor Awarded Suzhou High-quality Structures Award , December 2010 Suzhou Recycling Economy Demonstration Projects , December 2010 Urban Demonstration Project of Jiangsu Province, July 2010 Major Project of Taihu Lake Watershed Suzhou industry Park Eco Optimized Major Project Event• Place • Date • Your Name

  14. Authorities Involvement Visited by Mr. Zhu Guangyao, former vice chief of state bureau of Environmental Protedtion Visited by Mr.Wan Bentai, general engineer of National Environmental Protection Dept. Visited by Mr.He Quan, vice governor of Jiangsu Province Group photo of Completion Ceremony Visited by Chief of Environmental Protection Office Visited by Mr. Zhou Lan, chief of Housing Construction Office of Jiangsu Province

  15. OPERATION

  16. StandardizedProduction

  17. Comprehensive labelling

  18. Production Capacity June 24th:Max. daily treatment capacity 350 tons June 15th:cumulative capacity 10000 tons May 26th:daily treatment capacity stabilized over 250 tons May 19th:daily treatment capacity exceed 200 tons May 6th:Trial operation of three lines April 15th: Construction Completion Ceremony

  19. SINO FRENCH ENVIRONMENT Practitioner of Circular Economy in China

  20. Looking Forward to Your Visit Thank You