1 / 17

Activities on GNSS Implementation in Korea

APEC GIT/15 Meeting June 13~17, 2011 Brisbane, Australia. Activities on GNSS Implementation in Korea. The 15th Meeting of the APEC GNSS Implementation Team(GIT/15) June 14, 2011 Sofitel Brisbane Central, Brisbane, Australia Giwook Nam, Ph.D. Table of Contents.

gerd
Télécharger la présentation

Activities on GNSS Implementation in Korea

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. APEC GIT/15 Meeting June 13~17, 2011 Brisbane, Australia Activities onGNSS Implementationin Korea The 15th Meeting of the APEC GNSS Implementation Team(GIT/15) June 14, 2011 Sofitel Brisbane Central, Brisbane, Australia Giwook Nam, Ph.D.

  2. Table of Contents • GBAS Implementation • High Precision DGPS • GNSS Application

  3. GBAS Implementation

  4. Background for GBAS Program • Safety Issue • No ILS due to the terrain • CFIT Accidents (ASIANA Airline in 1992, Air China in 1996) • Capacity & Other Issues • Air Traffic increases 5% per year • More fuel consumption and CO2 emission

  5. 3 1 4 2 History of GBAS Activity • R&D for Academic Purpose • Develop GBAS prototype and T&E • Building experience and knowledge, gathering data for implementation of GBAS commercial service GBAS Test-Bed I (1998~2000) • GBAS Test-Bed II in Jeju Airport (2008~) GBAS Test-Bed II (2003~2007) DGPS Receiver (2001~2004) ’98 ’99 ’00 ’02 ’04 ’05 ’06 ’07 ’08 ’09 ’ 10

  6. GBAS Implementation Program • Objectives • GBAS CAT-I Implementation for Commercial Service • Establish regulatory process for GBAS implementation • Period : Oct. 2010 ~ Sep. 2014 (4 Years) • International Collaboration : AsA, Honeywell • Candidate Airport : Kimpo (Traffic), Kimhae (Safety)

  7. Milestoneof GBAS Implementation Program Operational Approval • 2012 GLS Procedure • 2013 ATC/Pilot Training • 2014 Flight Trial • 2011 Site Assessment • 2012 Installation • 2013 Flight Inspection • 2014 T&E Facility Approval with Certified GBAS Independent Monitor Unit

  8. High Precision DGPS

  9. Objective • Provide the precise and reliable positioning service • Capable of recognizing lane on the road Urban Canyon Intermittent Signal Blockage Low Signal Strength Open Filed Phase1 Very Weak Signal Phase2 Development of HADGPS technologies to recognize lane inGood GNSS Signal Environment Development of receivertechnologies to recognize lane in Bad GNSS Signal Environment

  10. The System Concept ① ∼ ⑥ common ① Satellite Orbit Error ② Satellite Clock Error ③ Satellite Data Error Digital Map ④ Ionosphere Error ⑤ Atmosphere Error ⑥ Signal Deformation Display) Signal Block ⑦ Multipath ⑧ Receiver Error Master Station Signal Acquisition Signal Acquisition Networked Carrier Phase DGPS Application Users Master Station ① ∼ ⑥ Error Correction ⑦ ∼ ⑧ Error Correction Reference 0.33 0.45 U-Transportation Smart Highway

  11. 2011 year 2010 year Research Status • Develop Simulation Environment • Modeling GNSS Signal Error Condition • Generating the GNSS Signal with Error • Evaluating Algorithms through Simulation • Field Test under Real Road Environment • - Development of Test Equipments • - Real Data Acquisition on the Road • Data Processing for Precise Positioning GNSS Signal Generation Reference & Master Station Test User Receiver Reference Station Correction Message HDGPS Master Station User Digital Map On Going

  12. KARI-JAXA Collaboration KARI Use QZSS as test platform to broadcast correction message To improve the position Accuracy in Urban Canyon Environment JAXA Test QZSS performance in Korea

  13. GNSS Application

  14. Solving national issues with GNSS technology Development of GNSS application technology toimprove public safety Road Detect and Prevent React to Disaster Aviation GPS Jamming Marine Tsunami Collision Vehicle Accident

  15. Example of Road Disaster : Accident of Large Vehicles Carrying Dangerous Goods Veer off Roll Over Jack Knifing Detect Symptoms of Accident Report Accident to Agency Mitigate effect of accident Give warning to drivers

  16. Concept of Detecting Symptoms of Car Accident RearGPS/INS Sensor FrontGPS/INS Sensor Accuracy: <many cm Accuracy: <30~40cm GPS/INS based precision relative position information Roll over Detection GPS/INS based precise location information Jack Knifing Detection Veer off Detection Real-time simulator

  17. Thank you

More Related