1 / 10

Proposal for Task Group Deliverables May 9, 2004

This proposal outlines the deliverables for the IEEE 802.11 FR Study Group, including defining terminology, surveying current BSS-Transition Orthodoxy, use cases, functional requirements, test methodology, performance metrics, selection/acceptance criteria, and drafting a standard.

Télécharger la présentation

Proposal for Task Group Deliverables May 9, 2004

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Proposal for Task Group DeliverablesMay 9, 2004 Clint Chaplin IEEE 802.11 FR Study Group (cchaplin@sj.symbol.com) Clint Chaplin, FR SG Chair

  2. Deliverables • Define Terminology • Survey of Current BSS-Transition Orthodoxy • Use Cases (Usage Model) • Functional Requirements • Test Methodology • Performance Metrics • Selection/Acceptance Criteria • Draft Standard Clint Chaplin, FR SG Chair

  3. Define Terminology • “Security must not be decreased” • Others? Clint Chaplin, FR SG Chair

  4. Survey of Current BSS-Transition Orthodoxy • What are the necessary and optional steps currently taken during a BSS Transition • What is specified vs. what is implicit • Include TGe, TGi • Include others? Clint Chaplin, FR SG Chair

  5. Use Cases (Usage Model) • What application types need TGr, and what are the requirements that are needed? Clint Chaplin, FR SG Chair

  6. Functional Requirements • What are the key requirements that IEEE 802.11r needs to meet? Clint Chaplin, FR SG Chair

  7. Test Methodology • What are the test setups used to measure BSS Transitions? • Under what conditions are tests to be made? • What is measured during tests? • 11-04-0086-02-frfh-measurement-802-11-roaming-intervals.ppt • 11-04-0378-00-frfh-roaming-intervals-measurements.ppt • 11-04-0377-01-frfh-analysis-roaming-techniques.ppt Clint Chaplin, FR SG Chair

  8. Performance Metrics • What results from the test setup are acceptable? What is our minimum acceptable threshold on the tests? • Put another way, what maximum times in the tests are acceptable? Clint Chaplin, FR SG Chair

  9. Selection/Acceptance Criteria • What criteria is used to accept/reject proposals? • Not necessarily a down-select criteria; may be more than one solution in standard. • Information from previous deliverables used in this deliverable. • Contradictory vs. complimentary solutions? Clint Chaplin, FR SG Chair

  10. Draft Standard • Call for proposals • Present proposals • Apply selection criteria • Accept proposal(s) • Draft draft Clint Chaplin, FR SG Chair

More Related