1 / 4

NEW SUGAR DRYER FROM BRASIL -1500 T/DAY CAP -2,7M DIA X 12,6M LONG –ROTOLOUVE TYPE .

NEW SUGAR DRYER FROM BRASIL -1500 T/DAY CAP -2,7M DIA X 12,6M LONG –ROTOLOUVE TYPE. Coal/Bagasse power plant under construction at SAV. ELECTRICITY FROM BAGASSE. 2 X 44,5 MW cap. MAIN POWER PLANT EQUIPMENTS. 2 boilers, 185 / 160 T/H [BAG /COAL] 82 b -525 Oc ESP’s for gas emissions controls

glenda
Télécharger la présentation

NEW SUGAR DRYER FROM BRASIL -1500 T/DAY CAP -2,7M DIA X 12,6M LONG –ROTOLOUVE TYPE .

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NEW SUGAR DRYER FROM BRASIL -1500 T/DAY CAP -2,7M DIA X 12,6M LONG –ROTOLOUVE TYPE .

  2. Coal/Bagasse power plant under construction at SAV. ELECTRICITY FROM BAGASSE 2 X 44,5 MW cap

  3. MAIN POWER PLANT EQUIPMENTS • 2 boilers, 185 / 160 T/H [BAG /COAL] 82 b -525 Oc • ESP’s for gas emissions controls • 2 condensing/ pass out turbo-generator sets, 44,5 MWe • 2 Cooling towers • Bagasse & coal handling system • ash handling & disposal systems • Demin water &effluent water treatment plant • electrical switchgears & transformers for export @ 66Kv • control system • buildings (offices, stores, workshops..), roads

  4. Main power plant equipments under construction.

More Related