Running and Future Projects at Helsinki University

Running and Future Projects at Helsinki University. M. Aicheler 31.01.2013. CLIC RF structure R&D. high-precision assembly & machining R&D for CLIC RF structures ( in collaboration with VTT & Finnish companies …)

gordy
Télécharger la présentation

Running and Future Projects at Helsinki University

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Running and Future Projects at Helsinki University M. Aicheler 31.01.2013

  2. CLIC RF structure R&D • high-precision assembly & machining R&D for CLIC RF structures (in collaboration with VTT & Finnish companies…) • model thermo-mechanical behaviour of CLIC module during operation • industrialisation & cost study for CLIC RF structures • development of technique for dynamic vacuum measurement (DVM) & for internal geometry measurement for CLIC accelerating structure (in collaboration with prof. E. Haeggström, University of Helsinki) RF structure prototype disk manufactured in Joensuu @ North Karelia University of Applied Sciences. Test setup for DVM development in Helsinki

  3. MeChanICs • FP7/People/IAPP (Industry-AcademiaPartnerships and Pathways) projectMeChanICs, “Marie Curie linking Industry to CERN” • start September 1st 2010, end 30th of August 2014 • budget: ~ 1 M€ • to enhance knowledge exchange between Partners in high precision manufacturing by two-way intersectoralsecondments and dissemination workshops

  4. MeChanICs • Objective: enable & enhance long term industry participation in CLIC, Compact LInear Collider, RF structure R&D • Participation in each step of RF structure manufacturing • - 5 Work Packages

  5. Secondments and recruitments For more information: http://www.hip.fi/mechanics/ Today

  6. ‘TAVAKS’ (~”To Habit”) Customer oriented development of ultrahigh precision manufacturing in Finnish industryTArkuuusValmistuksen Asiakaslähtöinen valmiuksien Kehittäminen Suomalaisessa teollisuudessa Project introduction 27.9.2012 University of Helsinki, Helsinki Istitute of Physics, HIP Technical Research Centre of Finland VTT North Carelia University of Applied Science, NKUAS

  7. TAVAKS Objectives The aim of the project is to increase the knowhow and capability of manufacturing ultra-high precision components and assemblies in Finnish industry. Productions steps from raw material to finalized components and assemblies are considered as well as the requirements and interaction between different steps in the production chain. 6 work packages: WP 1 Material research WP 2 Ultra-high precision machining&Pre-machining WP 3 Diffusion bonding and laser welding WP 4 State of the Art and Market analysis WP 5 International cooperation WP 6 Coordination Development work is based on CLIC components and assemblies. One goal is to establish capability to produce CLIC disks and test components and support CLIC development work.

  8. MeChanICs  TAVAKS MeChanICs CERN 2015 2013 2014 2010 2011 2012 Lewel Metso Loval CLIC Mectalent Tarkmet Mectalent Lewel Metso Tarkmet Secondments, work shops; knowledge exchange Loval UH/HIP Comatech Protoshop Luvata Metlab Mikes TAVAKS Company, production R&D

  9. TAVAKS partners and funding Research Organisations Helsinki Istitute of Physics UH/HIP Technical Research Centre of Finland VTT North Carelian University of Applied Science NKUAS Industrial partners Loval Oy, bonding (MeChanICs) Tarkmet Oy, laser welding (MeChanICs) Protoshop Oy, machining Comatec Oy, FE-modeling Luvata Oy, material delivery for project needs Metlab Oy, metallurgical analysis Centre for Metrology and Accreditation MIKES Funding has been applied from TEKES separately for the individual projects. (TEKES=Finnish Funding Agency for Technology and Innovation). Project is planned to last 2 years, from 2012 to 2014.

  10. Collider Linking Initiative to Medical applications and Beyond • PEOPLE - MARIE CURIE ACTIONS • Marie Curie Initial Training Networks (ITN) • Call: FP7-PEOPLE-2013-ITN • Multi-Partner ITN • Budget: 4 mio Euros • Timeframe: 4 years • Status: under evaluation ESR = Early stage researchers

  11. CLIMB structure • Number of involved countries (full partners): 7 • Number of CERN hostingESRs: 2

  12. CLIMB S&T topics • ESRs will interact with each other for mutual information and understanding • Common seminars and training weeks

  13. CLIMB (expected) dates • Result of the evaluation: 04/2013 • Decision for funding: 05/2013 • Negotiations: 09/2013 • Project launch: 01/2014 … more details next year on CLIC-WS2014!!! Thanks for your attention

  14. Spare slides

  15. WP 1 MeChanICs Design, Lewel Group VACUUM MANIFOLD & COOLING SYSTEM VACUUM FLANGE • participation of CLIC accelerating structures design (containing all necessary systems) • 3 TeV CLIC will have 143 000 such structures RF FLANGE VACUUM PORT ALIGNMENT Added value for Lewel: learnt vacuum techniques VACUUM PORT WAVEGUIDE INTERCONNECTION WFM WAVEGUIDE COOLING FITTING BEAM DIRECTION COOLING TUBE BONDED DISK STACK

  16. WP 2 MeChanICs material, Metso • Material research: • HIP-diffusion bonding of copper disks • The effect of heat treatment to diamond turned copper surface • The effect of HIP-treatment to physical properties of solid copper • HIP compaction of copper powder • Brazing of copper with electrodeposited coating Added value for Metso: learned more about Cu

  17. WP 3 MeChanICs machining, Tarkmet Topics of the work: Precision machining Laser welding Metrology 26 high-precision machined disks (OFE Cu, shape accuracy  2.5 m, surface roughness  0.025 m,  45 to 88 mm) in each accelerator structure

  18. WP 4 MeChanICs brazing, Loval Bonding of the disk stack in partial H2 pressure 26 high-precision machined disks (OFE Cu, shape accuracy  2.5 m, surface roughness  0.025 m,  45 to 88 mm) bonded together

  19. WP 5 MeChanICs assembly, Mectalent • prototypes of CLIC accelerating structures • assembly, tooling, test module, environment, thermomechanical behaviour, metrology, validation • large series production design

  20. Content • MeChanICs • TAVAKS • CLIMB