An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. DevelopmentStrategies in ‘Round One’ Stuart Hall, natural power BWEA – UK Offshore Wind 2003

  2. Natural Power Experience • Case studies- Solway offshore (~180MW) • - Codling offshore (660MW+) • - Lillgrund offshore (120MW) - Crystal Rig (63MW) - Bowbeat (31MW) - Deucheran Hill (16MW) • Services- Resource / Energy assessment programmes • - Windfarm design • - Development management incl. EIA, permits, PPAs • - Construction management • - Operations management • ~345MW consented, ~800MW in planning, ~2,000MW in design Development Strategies in 'Round One'

  3. Development Problems • Options • Preferences • Pressures • Competing interests • Inexperience • Uncertainty • Risk Development Strategies in 'Round One'

  4. The Solution 1/4 • Decide on a clear management strategy… • In-house Management • External Management. Both choices require experience, competence and time/resource • Define a development strategy… • Higher exposure / lower risk / quicker build - carry out detailed surveys to allow quick construction before permits awarded, or • Lower exposure / higher risk / slower build - carry out only limit surveys before permits awarded. Development Strategies in 'Round One'

  5. The Solution 2/4 • Define permitting path - Legal advice - T&WA, CPA, FEPA, EA S36&S37, Private Bill, T&CPA, - Cable crossing railways, flood defences, roads. • Define the project… • Physical & economical constraints, - Lease area, depth, ecology, infrastructure, other users, grid, sensitive views, WTG size, economics indices… • Project scale, - Following constraints and scoping consultations  Development Strategies in 'Round One'

  6. Solway Constraints Development Strategies in 'Round One'

  7. The Solution 3/4 • Define a design philosophy… • Must be clear, understandable and communicable, i.e. Rigid grid, randomised, emblemic • Royal Fine Arts Commission (of Scotland) (design consultee) • Competently led and managed (design pressures ) Development Strategies in 'Round One'

  8. Wind engineering - Seeks  yield & capacity Civil engineering - Seeks cheap & simple construction Financial -  return and  risk. Economic? Financable? O&M - Easy access, reliable technology Manufacturer -  Separation dist, standard WTG Consultees -  impacts,  benefits Example Design Pressures • Permitting - Seeks an easy life ( impacts,  benefits) Development Strategies in 'Round One'

  9. Will raise sea levels and increase flooding Reduce on-shore windspeeds Sailing will be impossible because of distorted winds Always on the best fishery The Solution 4/4, finally • Communicate, consult & optimise design • The permitting process • Misconceptions: Development Strategies in 'Round One'

  10. UK further offshore Layout: 450m x 600m 220 WTG 160m to tip 3 to ~5.5MW ea Codling Bank Issues… I.e. wake predictions Development Strategies in 'Round One'

  11. The End Stuart Hall, natural power BWEA – UK Offshore Wind 2003 Wind Energy Consultants & Services