An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. POWER GRID CORPORATION OF INDIA LTD SOUTHERN REGIONAL LOAD DESPATCH CENTRE WELCOMES YOU

  2. LINKS SOUTHERN REGION GRID HIGHLIGHTS ANDHRA PRADESH GRID HIGHLIGHTS KARNATAKA GRID HIGHLIGHTS KERALA GRID HIGHLIGHTS TAMIL NADU GRID HIGHLIGHTS SOUTHERN REGION INSTALLED CAPACITY ANDHRA PRADESH INSTALLED CAPACITY KARNATAKA INSTALLED CAPACITY KERALA INSTALLED CAPACITY FREQUENCY PIE-CHART APRIL 2002 TAMIL NADU INSTALLED CAPACITY FREQUENCY PIE-CHART LAST FOUR YEARS IMPORT THROUGH HVDC INTER REGIONAL EXCHANGES MORE LINKS

  3. LINKS - 2 SIGNIFICANT MILESTONES PROBLEMS BANGALORE VOLTAGE VS MVAR SOLUTIONS EXPECTED GENERATION EXPECTED TRANSMISSION INSTALLATION OF SHUNT CAPACITOR KARNATAKA - ISSUES GRID DISTURBANCES DURING 2002 ALLOCATION OF SHARES GRID MAPS 3D DEMAND CURVE APRIL 2002 3D FREQUENCY CURVE APRIL 2002 CERC PETITIONS SRLDC EXPENDITURE VOLTAGE PROFILE SRLDC MAN POWER

  4. IMPORT THROUGH HVDC IN MUS

  5. IN MUs

  6. INSTALLED CAPACITY OF SOUTHERN REGION AS ON 31.03.2002 IN MW 26163MW

  7. INSTALLED CAPACITY OF SR IN MW AS ON 31st March 02

  8. INSTALLED CAPACITY OF ANDHRA PRADESH AS ON 31.03.2002 IN MW 7860MW

  9. AS ON 31st March 02

  10. INSTALLED CAPACITY OF KARNATAKA AS ON 31.03.2002 IN MW 4813MW

  11. AS ON 31st March 02

  12. INSTALLED CAPACITY OF KERALA AS ON 31.03.2002 IN MW 2553MW

  13. AS ON 31st March 02

  14. INSTALLED CAPACITY OF TAMIL NADU AS ON 31.03.2002 IN MW 6587MW

  15. AS ON 31st March 02

  16. PROGRESS OF SHUNT CAPACITORS * As furnished in 127th SREB meeting held on 6th June 2001.

  17. EXPECTED GENERATION ADDITIONS EXCEL FILE

  18. EXPECTED TRANSMISSION LINES IN CKT KMS EXCEL FILE

  19. Frequency Profile: Last 4 years

  20. FREQUENCY SPECTRUM FOR APRIL 2002

  21. SIGNIFICANT MILESTONES • 1000MW IMPORT FROM WR ON 16/07/2001. HVDC CAPACITY FULLY UTILIZED. • 500MW BEING AVAILED FROM ER FROM MARCH 2002. HVDC CAPACITY FULLY UTILIZED. • IMPORT FROM NEIGHBOURING REGIONS - 5105MU DURING 2001-02 - COMPARED TO 3898MU DURING 2000-01 (ie. A RISE OF 31%). • AC BYPASS ARRANGMENT AT HVDC STATION, BHADRAVATI UTILISED FOR FAST RESTORATION DURING DISTURBANCE. • PEAK DEMAND MET 20063 MW DURING MARCH 2002 - COMPARED TO 19428 MW IN MARCH 2001.(ie. A RISE OF 3%).THE TOTAL CONSUMPTION DURING 2001-02 - 130821 MU - COMPARED TO 127524 MU DURING 2000-01(ie A RISE OF 3%). • DORMANT INTER STATE LINES BETWEEN ANDHRA PRADESH AND KARNATAKA i.e. 220KV GOOTY-BELLARY & SADEM-TANDUR MADE USE FROM 1st & 2nd MAY 2002 RESPECTIVELY. • ULDC CONTROL ROOM AT SRLDC FULLY FUNCTIONAL FROM 1st MARCH 2002. • SLDC’s OF KARNATAKA, KERALA & TAMIL NADU EXTENSIVELY USING ULDC SCHEME. TRIAL OPERATION IN PROGRESS IN ANDHRA PRADESH.

  22. PROBLEMS • LOW GRID FREQUENCY • LOW VOLTAGES • HEAVY MVAR DRAWALS • CAPACITOR INSTALLATION-BACKLOG • MEAGRE RELIEF FROM AUFR’S • RELUCTANCE - MANUAL LOAD SHEDDING • TRANSMISSION CONSTRAINTS • PROTECTION CO-ORDINATION • GRID • DEFENCELESS • VULNERABLE

  23. SOLUTION • MAINTAIN FREQ BETWEEN 49-50.5 HZ • ACCELERATE SHUNT CAPACITOR INSTALLATION • REINSTATE 2 STAGE UFR’S • PROTECTION CO-ORDINATION • AUGMENTATION OF TRANSMISSION • SCIENTIFIC SETTLEMENT SYSTEM-ABT • FREE GOVERNOR MODE • SELF HEALING MECHANISM • CONJUNCTION

  24. KARNATAKA ISSUES 1 400/220 KV 500MVA TRANSFORMER AT HOODY CONTINUOUSLY OVER LOADED - FREQUENT TRIPPING. - GRID DISTURBANCES/SEPARATIONS 2 INADEQUATE SHUNT COMPENSATION - EXTREME LOW VOLTAGE (300KV) AT BANGALORE - FREQUENT POWER SWINGS - RESTRICTION IN INTER REGIONAL ASSISTANCE 3 NO REDUNDANCY IN 220KV NETWORK – LINES FULLY LOADED. 4 OBSOLETE PROTECTIVE RELAYS – FREQUENT MALOPERATION. 5 MAJORITY EXISTING 220KV SUB-STATIONS WITHOUT BUS-BAR PROTECTION. 6 POOR MONSOON - DEPLETED HYDEL RESERVOIR. - PERPETUAL OVER DRAWAL AT LOW FREQUENCY.

  25. DISTURBANCES IN SOUTHERN REGION DURING 2002

  26. ALLOCATION OF SHARES IN MW

  27. PETITIONS • SRLDC FILED 10 PETITIONS AND 3 AFFIDAVITS WITH CERC ON MAINTENANCE OF GRID FREQUENCY. • KPTCL FILED WRIT PETITION IN THE HIGH COURT OF KARNATAKA AGAINST CERC ORDER DATED 14-02-2002. • HIGH COURT OF KARNATAKA IN ITS INTERIM ORDER DATED 22-03-2002 STAYED CERC ODRER 14.02.2002. • SRLDC FILED LATEST PETITION WITH CERC ON 03-05-2002 ON MAINTENANCE OF GRID FREQUENCY.

  28. O & M EXPENDITURE OF SRLDC DETAILS

  29. EXPENDITURE OF SRLDC

  30. MAN POWER OF SRLDC