An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ORNL Commissioning Experiences Missy Ogan

  2. AMCL - Details • Will house world’s current most sensitive microscope! • No Electromagnetic fields close by. • User wanted minimal metals in building. • Very low air flows – during microscope operation. • Design-Bid-Build method

  3. AMCL – Commissioning • CX was brought in by AE too late in design process ~90% • Lots of engineering hold points to measure and verify rebar placement. • Lots of measurements to verify HVAC performance in Instrument room. • Reqd final measurements to verify Electromagnetic fields.

  4. AMCL • Construction bids were way over budget. • Contractor unfamiliar with CX term. $$ to cover • Many other factors went into $$$ (DDC, Arch design) • Currently redesigning with GMP approach and Contractor on board. • CX in-house • No Hold points • No testing of electromagnetic fields as part of project • No special air flow tests.

  5. Private Sector Bldg - Commissioning • Developer got CX on board way too late in design. • Cancelled Developer CX contract after first meeting – ORNL contracted for CX. • ORNL has VERY limited engineering staff • Building ~ 150,000 nusf • ORNL CX doing great job! • CX also assisting project team with LEED documentation.

  6. Joint Institute for Computer Science • State bldg • ORNL provided CX from beginning of design (same CX as on Private Sector). • ORNL cancelled LEED LAP contract at ~ 60% and gave to CX. • Construction under way and all is going good.

  7. Mouse House -Commissioning • Design-Build – complicated HVAC system • CX on board late. • Draft of CX plan rejected. • CX details coming together with our guidance.

  8. CX General • MASTERSPEC – new sections (have not used) • 01810 General Commissioning Requirements • 01815 HVAC Commissioning Requirements • Has helped to augment our Engineering staff especially during construction. • Proved beneficial for CX to assist with LEED.