Plugging Abandoned Wells in Unconsolidated Formations

Plugging Abandoned Wells in Unconsolidated Formations. Abandoned wells can bypass natural protective geological features and provide a pathway for contaminants to flow directly into our drinking water aquifers. DRINKING WATER AQUIFER.

hachi
Télécharger la présentation

Plugging Abandoned Wells in Unconsolidated Formations

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Plugging Abandoned Wells in Unconsolidated Formations

  2. Abandoned wells can bypass natural protective geological features and provide a pathway for contaminants to flow directly into our drinking water aquifers. DRINKING WATER AQUIFER

  3. Abandoned wells and well pits are a safety hazard for children.

  4. PLUGGING AN ABANDONED WELL IN AN UNCONSOLIDATED FORMATION STEPS • LOCATE ABANDONED WELL • REMOVE OBSTRUCTIONS FROM WELL • MEASURE DEPTH & DIAMETER OF WELL • CALCULATE VOLUME OF PLUGGING MATERIAL NEEDED • EMPLACE PLUGGING MATERIAL • RESTORE SITE • COMPLETE ABANDONED WELL PLUGGING RECORD

  5. Use records, surveys, permits, or other documents that are available for the property to locate the old well. Suspected location of 2nd abandoned well @ neighbor. X

  6. REMOVE ALL OBSTRUCTIONS FROM THE WELL

  7. MEASURE WELL DEPTH TO ESTIMATE THE VOLUME OF PLUGGING MATERIAL NEEDED

  8. EXAMPLE 4 Inch Well, 100 feet deep (Contains approx. 66 liquid gallons) • Neat Cement • 13.4 feet/94 lb sack of Portland Cement (from GWQCR code p. 54) • Requires approx. 7.5 sacks to plug 100’deep, 4” well • 5.2 gallons of water/sack yields 8.8 gallons of grout. • Bentonite Chips • 7.9 feet/50 lb bag of Bentonite Chips (from GWQCR code p. 54) • Requires approx. 13 bags to plug 100’ deep, 4” well • Bentonite Slurry (Granular/Polymer) • 54 feet/50 pound bag of Granular + 1 pint Polymer (from Mfg. spec.) • Requires approx. 2 bags & 2 pints polymer to plug 100’ deep 4” well • 26-30 gallons of water/bag, with 1 pint of polymer yields 35.5 gallons of grout.

  9. RULESR 325.1664 Rule 164. (a-c) NEAT CEMENT, CONCRETE, OR BENTONITE GROUT SLURRIES * A tremie pipe from the bottom of the well to the ground surface must be used. All obstructions must be removed prior to placement of the tremie pipe.

  10. ASSEMBLE AND PLACE TREMIE PIPE TO BOTTOM OF WELL 120’ OF THIN WALL TREMIE PIPE

  11. REMOVAL OF TREMIE PIPE IS RECOMMENDED. EXAMPLE: THREADED TREMIE PIPE IN 20 FOOT SECTIONS USED FOR PUMPING BENTONITE SLURRY DOWN 180’ WELL.

  12. Using Tremie Pipe Without Solvent-welding Joints

  13. TYPICAL BENTONITE GROUTING RIG ADDING THE POLYMER

  14. ADDING THE GRANULAR BENTONITE

  15. MIXING THE BENTONITE GROUT SLURRY

  16. BENTONITE SLURRY “RETURN” TO GROUND SURFACE. HYDRATED GRANULES

  17. TYPICAL CEMENT GROUTING RIG 6 gallons of water mixed with one 94 pound sack of Portland cement = 15 pound per gallon slurry weight.

  18. PUMP ESTIMATED VOLUME OF CEMENT GROUT INTO THE WELL. • STOP IF POOR OR NO “RETURN” TO THE SURFACE. • LOST CIRCULATION ZONES MAY REQUIRE SPECIAL PLUGGING MATERIALS OR ADDITIVES.

  19. Pump neat cement using a tremie pipe to the bottom of the well. Cloudy water will appear before the cement returns to the surface. Add 15-20% to allow for routine loss to formation.

  20. Neat Cement Grout / Tremie Pipe Removed

  21. WEIGHING SLURRY GROUT USING MUD SCALE Grout weight in mixer should equal weight of grout “return.”

  22. RULESR 325.1664 Rule 164. (a-c) POURING BENTONITE CHIPS OR PELLETS FROM THE SURFACE * USE A SCREEN TO REMOVE FINES. * ADD WATER TO PROMOTE HYDRATION.

  23. WHEN POURING BENTONITE, FINES MUST BE REMOVED PRIOR TO PLACEMENT INTO CASING TO AVOID BRIDGING

  24. PLACING PRE-SCREENED BENTONITE CHIPS BY HAND INTO 2” WELL CASING.

  25. DIRECT POURING OF BENTONITE CHIPS CAN RESULT IN FINES CAUSING BRIDGING… SLOW POURING LIKE THIS IS USUALLY INEFFECTIVE.

  26. UNSCREENED BENTONITE CHIPS BRIDGED IN THIS 2 INCH WELL. BREAKING THE BRIDGE WAS DIFFICULT.

  27. BE SURE THAT THE CHIPS HAVE HYDRATED

  28. FILL OUT AND SUBMIT AN ABANDONED WELL PLUGGING RECORD