Scalable manufacturing e quipment for production of mechatronic microsystems b ased on polymer film, laser milling and e- ink printing Coordinator : Markus Dickerhof, Karlsruhe Institute of T echnology. SMARTLAM ….

1 / 9

Télécharger la présentation

SMARTLAM …

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Scalablemanufacturingequipmentforproductionofmechatronicmicrosystemsbased on polymer film, lasermillingand e-inkprinting Coordinator: Markus Dickerhof, Karlsruhe Institute ofTechnology

  2. SMARTLAM … • … is about combining already existing rapid prototyping-, structuring- additive manufacturing technologies as well as assembly and production knowledge for system integration • … there´sstill a lotto do producecompletemicrosystems in a „Star-trek“-likemanner • …highly flexible, scalable cost efficient manufacturing environment for production of complete micro components in small medium series in one machine

  3. Small- medium volume manufacturing of miniaturized 3D-Parts using Rapid Prototyping technologies LOM: Volume productionof Bioanalytical 2.5D-disposable withchannelwidth <50µm Source: AlineInc.  Industrial useof rapid prototypingtechnologiesforsingleandsmallvolumeproductionhasreachedtheindustrialandconsumermarketintroduction. 3D- Manufacturing prototpyeofcomplexmechanicalsystems e.g. using FDM (Source: Stratasys) „lowcosttoolReplicator 2“ with double extruderfromMakerbot (ca. 80-100µm res.)) • Technologies: • Laminated Objects modeling (LOM) • Selective (Laser) Melting • 3D Printing (e.g. Fuseddeposition Modelling, FDM) • (Laser-)Sintering • Sterolithographymodelling (SLM) Testingof 3D metalprintingsystemforproductionof spare partsforthe ISS – the NASA electron beam freeform fabrication (EBF3)

  4. Small/medium volume manufacturing of miniaturized 3D-Parts using Rapid Prototyping technologies • Systems arefocussingsolely on manufacturingofpartswithmechanicfunctionality • Manyofthemare still not preciseenough  A setup, allowingtoproducemorecomplex, mechatronicsystemsbyuseof rapid prototpyingand additive manufacturingtechnologies in a costefficientwayis still missing Markus Dickerhof

  5. SmartLAM 3D-I – Modular Hardware Conceptand flexible Re-Configuration Sheet tosheetLamination / Thermobonding Ink- /aerosol-jetprinting CO2 + ExcimerLaser cutting/milling

  6. SMARTLAM – An Example… 3D-fluidic system Fluid lumen (eg. Buffer) Visualisation & User Interface polymer layer (Switchessimple displays,…) Througcontacting Polymer membranelayer patterned sensor and/or functionalized  layer. - Printedelectronicslayer - e-contactinglayerprintedand/oranisotropic film Battery (printedor NIL.filmbased) Integration ofdiscretecomponents, e.g. IC and/or Memory (assembly) (pre-) structured polymer film actingascarriersystem/ housing /

  7. An Opportunitytocreate Business in Emerging Markets - Electrophoresischipforbioanalyticaltesting - Customized LED forillumination 2 industrialdemonstrators+ 6 associatedpartners: DesignLED – Customizedhigh-end LED applications SMARTLAM addicted a completeworkpackagetothevalidationoftheeconomicaspects

  8. SmartLAMproject: Timeline 10/2015 After 2015 :Increasingflexibility 03/2015 03/2014 03/2013

  9. Thankyouforlistening! www.smartlam.eu markus.dickerhof@kit.edu