Preparation and ways of utilization of hydroelectric plants in system of ancillary services in Electric power system of Czech Republic. Ing. Jan Dřímal Control Systems Division OSC, a.s. Czech Republic. Hydroforum 2005. Resource control in EPS of Czech Republic. Power plant terminal (TELE).

halden
Télécharger la présentation

Ing. Jan Dřímal Control Systems Division OSC, a.s. Czech Republic

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Preparation and ways of utilization of hydroelectric plants in system of ancillary services in Electric power system of Czech Republic Ing. Jan Dřímal Control Systems DivisionOSC, a.s.Czech Republic Hydroforum 2005

  2. Resource control in EPS of Czech Republic

  3. Power plant terminal (TELE)

  4. System of ancillary services • Primary frequency control • Secondary power control • Tertiary power control • Quick starting reserve (available within 10 minutes) • Operating reserve (available within 90 minutes) • Secondary voltage and reactive power control • Island operation capability • Black start capability

  5. Preparation of power plants to provide ancillary services • Assessment of the properties and capacities of the power plant • Submitting an application • Preparation and verification of the capacity of power plant to provide selected ancillary services • Certification measurement • Equipment the power plant with the power generating plant terminal (TELE) • Conclusion the appropriate contracts with the TSO

  6. Model utilization in preparation of TG EDA for black start capabillity

  7. Comparison of model with real operation

  8. Preparation and ways of utilization of hydroelectric plants in system of ancillary services in Electric power system of Czech Republic Thank you for your kind attention Ing. Jan Dřímal OSC, a.s. Control Systems Division phone: +420 541 643 130 fax: + 420 541 643 109e-mail: drimalj@osc.cz www.osc.cz