halla-gordon
Uploaded by
14 SLIDES
284 VUES
140LIKES

Course Introduction Software Engineering

DESCRIPTION

Course Introduction Software Engineering. Yonsei University 2 nd Semester, 2014 Sanghyun Park. Course Goals (1/2). Software systems are ubiquitous Even simple software systems have a high inherent complexity

1 / 14

Télécharger la présentation

Course Introduction Software Engineering

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Course IntroductionSoftware Engineering Yonsei University 2nd Semester, 2014 Sanghyun Park

  2. Course Goals (1/2) • Software systems are ubiquitous • Even simple software systems have a high inherent complexity • Software engineering is an engineering disciplinewhose goal is the cost-effective development of software systems

  3. Course Goals (2/2) • This course introducesconcepts, theories, tools, and methodsfor the specification, development, management, and evolution of software systemsin the perspective of software engineering

  4. Prerequisite • Basic computer science background • Programming skill (C, C++, Java, …) • Data structure • Willing to cooperate as a team member

  5. Web Site • http://embio.yonsei.ac.kr/course/74 (class homepage) • Syllabus, announcements, lecture notes, homework, solutions, useful links, etc • http://www.pearsonhighered.com/sommerville/(publisher’s web site)

  6. Textbook • Software Engineering, 9th Edition,Ian Sommerville, Pearson, 2010

  7. Grades • 30% midterm exam • 30% final exam • 30% project • 10% attendance and class participation • ‘F’ will be given if absent more than 1/3

  8. Class Schedule • Week 1 Introduction to the course, Introduction to software engineering • Week 2 Project management and planning, Software processes • Week 3 Software processes (Agile software development) • Week 4 Requirement engineering • Week 5 System modeling • Week 6 Architectural design • Week 7 Design and implementation • Week 8 Midterm exam

  9. Class Schedule • Week 9 Design and implementation • Week 10 Software testing • Week 11 Software evolution • Week 12 Special topics • Week 13 Project presentation • Week 14 Project presentation • Week 15 Project presentation • Week 16 Final exam

  10. Project • One team with 4 members • More than 4 members if project is large (maximum 5) • Less than 4 members if project is small (minimum 3)

  11. Project Schedule (1/2) • End of 3rd weekOne page document which describes team members and project topic • End of 5th weekDocument for requirement analysis • End of 9th weekDesign document • End of 12th weekCompletely working source code and test plan with test cases

  12. Project Schedule (2/2) • End of 15th weekUser manuals,one-click installable source code,and test cases  Submit required materials to TA by 10 pm of due date  Late penalty: 10% each day

  13. TA Information • Name: 최원기 (Choi Wonki) • Office: C533-1 (2123-7757) • Email: cwk1412@cs.yonsei.ac.kr

  14. Any questions or comments on this class?