1 / 8

Offsets Implementation Cost Containment

Offsets Implementation Cost Containment. C-AGG Workshop October 9, 2013. Existing Cost Containment Options. Small projects, <25,000 mtCO2e, can verify biennially Skip one year of verifications Only credited after verification. Existing Cost Containment Options. Authorized Project Designee

hallam
Télécharger la présentation

Offsets Implementation Cost Containment

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Offsets Implementation Cost Containment C-AGG Workshop October 9, 2013 California Air Resources Board

  2. Existing Cost Containment Options • Small projects, <25,000 mtCO2e, can verify biennially • Skip one year of verifications • Only credited after verification California Air Resources Board

  3. Existing Cost Containment Options • Authorized Project Designee • Multiple project operators can contract with a single entity to aid in monitoring, reporting, and verification • Economy of scale • Each project is credited individually and not dependent upon the success of others California Air Resources Board

  4. Existing Cost Containment Options • Cooperative • Forestry • Multiple forest owners can join together to form one project • One report, one verification • All lands credited together and depend on the success of others California Air Resources Board

  5. Additional Cost Containment • Streamlining DNDC • Working to make operation of the DNDC more user-friendly • Contract to develop front and back ends for DNDC • Verification tools • Remote sensing • Others California Air Resources Board

  6. C-AGG Proposal • ARB Accredited Aggregator • Staffing • Minimum levels • ARB accredited staff • Liability insurance • Outstanding questions • How are reports submitted • Frequency of verification • Number/Percent of projects verified annually California Air Resources Board

  7. Considerations for Aggregation • Inconsistent with WCI design document • Inconsistent with transparency requirements • Centralized reporting and verification with heterogeneous baselines • Uncertain implications of an adverse verification California Air Resources Board

  8. General Offset Requirements • Individual project operators are public • Each project location is public • Every individual project’s data is public • Limited to what is required in Offset Project Data Report California Air Resources Board