340 likes | 428 Vues
軟體流程能力評估分析系統. 李文誌 資四 B 902959 鄭麗燕 資四 B 902965. 大綱. 摘要 說明 系統畫面 參考資料. 摘要. 我們做的專題就是針對 SPICE 1-2-1 和 Capability Adviser 為例。我們想做的就是類似它們的功能。雖然我們做的功能沒有那麼完整,我們有忽略到一些功能 ( 列如:每一個說明的部份、等等 ) 但是我們也有加一些功能。. 說明. ISO 15504 is complementary to several other international standards:
E N D
軟體流程能力評估分析系統 李文誌 資四B 902959 鄭麗燕 資四B 902965
大綱 • 摘要 • 說明 • 系統畫面 • 參考資料
摘要 • 我們做的專題就是針對SPICE 1-2-1和Capability Adviser為例。我們想做的就是類似它們的功能。雖然我們做的功能沒有那麼完整,我們有忽略到一些功能(列如:每一個說明的部份、等等)但是我們也有加一些功能。
說明 ISO 15504 is complementary to several other international standards: • ISO 9001:2000 – quality management systems Provides a strong process management approach to the establishment of a quality management system. • ISO/IEC 12207 – software life cycle processes Provides an overall contextual framework for software life cycle processes. • ISO/IEC 15288 – system life cycle processes Provides a common process framework covering the life cycle of man-made systems.
Assessment indicators • Process Performance Indicators 1. Base Practice (BP) an activity that addresses the purpose of a particular process 2. Work Product (WP) • Process Capability Indicators 1. Generic Practice (GP) activities of a generic type and provide guidance on the implementation of the attribute's characteristics 2. Generic Resource (GR) associated resources that may be used when performing the process in order to achieve the attribute, including human resources, tools, methods and infrastructure 3. Generic Work Product (GWP) sets of characteristics that would be expected to be evident in work products
ENG.4 Software Requirement Analysis • Process Purpose The purpose of the Software requirements analysis process is to establish the requirements of the software elements of the system. • Process Outcomes As a result of successful implementation of Software requirements analysis process: 1) the requirements allocated to the software elements of the system and their interfaces are defined; 2) software requirements are analyzed for correctness and testability; 3) the impact of software requirements on the operating environment are understood; 4) consistency and traceability are established between the software requirements and system requirements; 5) prioritization for implementing the software requirements is defined; 6) the software requirements are approved and updated as needed; 7) changes to the software requirements are evaluated for cost, schedule and technical impact; and 8) the software requirements are baselined and communicated to all affected parties.
Base Practices of ENG.4 • ENG.4.BP1: Specify software requirements. • ENG.4.BP2: Determine operating environment impact. • ENG.4.BP3: Develop criteria for software testing. • ENG.4.BP4: Ensure consistency. • ENG.4.BP5: Evaluate and update software requirements. • ENG.4.BP6: Communicate software requirements.
SUP.9 Problem Resolution Management • Process Purpose The purpose of the Problem resolution management process is to ensure that all discovered problems are identified, analyzed, managed and controlled to resolution. • Process Outcomes As a result of successful implementation of the Problem resolution management process: 1) a problem management strategy is developed; 2) problems are recorded, identified and classified; 3) problems are analyzed and assessed to identify acceptable solution(s); 4) problem resolution is implemented; 5) problems are tracked to closure; and 6) the status of all problem reports is known NOTE: Problem resolution management may initiate a change request.
Base Practices of SUP.9 • SUP.9.BP1: Develop problem resolution strategy. • SUP.9.BP2: Identify and record the problem. • SUP.9.BP3: Provide initial support and classification. • SUP.9.BP4: Investigate and diagnose the cause of the problem. • SUP.9.BP5: Assess the impact of the problem to determine solution. • SUP.9.BP6: Execute urgent resolution action, where necessary. • SUP.9.BP7: Raise alert notifications, where necessary. • SUP.9.BP8: Implement problem resolution. • SUP.9.BP9: Initiate change request. • SUP.9.BP10: Track problem status.
MAN.3 Project Management • Process Purpose The purpose of the Project management process is to identify, establish, co-ordinate, and monitor the activities, tasks, and resources necessary for a project to produce a product and/or service, in the context of the project’s requirements and constraints. • Process Outcomes As a result of successful implementation of Project management process: 1) the scope of the work for the project is defined; 2) the feasibility of achieving the goals of the project with available resources and constraints are evaluated; 3) the tasks and resources necessary to complete the work are sized and estimated; 4) interfaces between elements in the project, and with other project and organizational units, are identified and monitored; 5) plans for the execution of the project are developed and implemented; 6) progress of the project is monitored and reported; and 7) actions to correct deviations from the plan and to prevent recurrence of problems identified in the project are taken when project targets are not achieved.
Base Practices of MAN.3 • MAN.3.BP1: Define the scope of work. • MAN.3.BP2: Define project life cycle. • MAN.3.BP3 Evaluate feasibility of the project. • MAN.3.BP4: Determine and maintain estimates for project attributes. • MAN.3.BP5: Define project activities and tasks. • MAN.3.BP6: Define needs for experience, knowledge and skills. • MAN.3.BP7: Define project schedule. • MAN.3.BP8: Identify and monitor project interfaces. • MAN.3.BP9: Allocate responsibilities. • MAN.3.BP10: Establish project plan. • MAN.3.BP11: Implement the project plan. • MAN.3.BP12: Monitor project attributes. • MAN.3.BP13: Review progress of the project. • MAN.3.BP14: Act to correct deviations.
參考資料 • ISO/IEC15504-4:2004(E) setting target capability 講義 • 15504 v5.03.2.2a講義 • http://neural.cs.nthu.edu.tw/jang/ • http://www.cs.nthu.edu.tw/~jang/mlbook/ • Capability Adviser • 15504 PRM v5.11.1.0a 講義 • SPICE Standard File • SPICE 1-2-1