Software Solutions for Landscape Professionals

“ Landscape Job Costing and Project Management” Planning for Profitability 2011 Webinar Series January 16,2012. Software Solutions for Landscape Professionals. Presenter: Marcus v andeVliet Consultant – MV Enterprises marcusv@aol.com. The Agenda. The project management process.

hamlin
Télécharger la présentation

Software Solutions for Landscape Professionals

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. “Landscape Job Costing and Project Management” Planning for Profitability 2011 Webinar Series January 16,2012 Software Solutions for Landscape Professionals Presenter: Marcus vandeVliet Consultant – MV Enterprises marcusv@aol.com

  2. The Agenda • The project management process. • Job Package. • Scheduling. • Pre Project phase • CO • Sales • Job costing. • Job Log / work daily. • Customer communications. • Manage 360 demonstration.

  3. Project Management Process • Approve the estimate. • Create the Job. • Develop the Job Package • Material PO • Job Logs • Material List • Work Order • Schedule the project • Pre project Planning • Project progress • Project completion

  4. Job Package • This is a package of information provided by sales containing all the production information. • This is the transfer point from sales to production for any project. • Critical for the effective communication of all requirements: • Customer needs and special instructions. • Estimating notes and information. • Sales notes and information. • Production notes and information.

  5. Job package should be given to the supervisor or Foreman after the project has been scheduled. • Job packet does not have to be 100% complete. • Projects should not be scheduled until all required information is provided. • Production should visit the project site prior to the preconstruction meeting.

  6. Job Package • Copy of the Plan • Layout Details • Estimate notes • Special Notes/Details/Instructions • Technical Details • Work Daily • Materials List • Estimate Detail Report • Client Information Sheet • Special Instructions • Map & Directions • Blank Change Order

  7. Schedule Phase • Weekly Schedule Meeting • Long term Schedule: All sold projects by crew type. • 1 month schedule on Magnetic board. • 3 Day Magnetic Board: Detailed info. of Projects for production. • Verification of production info (Job Package must be complete to schedule project) • Communicate and update schedule with Clients after meeting.

  8. 1 Month Schedule

  9. 3 Day Schedule Detail

  10. Sales/Production on-site Meeting • Prior to Project Commencement • Sales Items • Review client issues, concerns, instructions, priorities • Review Estimate info • Discuss Technical Items • Review Design Concepts • Production questions. • Production plan: LIMES • Client introduction

  11. Material Handling • Purchase Order System • Verify Estimate Purchase Orders • Verify supplier cost • Verify material Handling • Stage in Yard • Deliver direct to site • PU at supplier • Pre deliver materials as project/site allows • Pre deliver equipment as project/site allows

  12. Production Project Commencement • Verify all project information is complete and updated. • Utility mark out complete. • Verify all materials ordering, Staging & Deliveries. • Finalize production plan: focus on first and last day. • Collect or trigger commencement payments as per contract.

  13. Daily Production Items • Complete Paperwork • Complete Work Daily (Replaces Time clock) • Material master list Update • Material Inventory Sheet • Supplier invoices, Bills, Delivery tickets, etc. • Project Log of events • Daily client communications • Site Management • Clean up • Safety • Organization • Low customer impact • Daily project plan • 2 days ahead

  14. Change Order Process • Determine CO process with customer, during contract review. • Determine Change order info and enter in Manage 360 • Complete Change Order form and payment schedule • Signed Change Order by Client • Deposit For Change Order based on work to be Completed • Track CO as a separate work area. • Collect CO payment upon completion of CO.

  15. Weekly Sales Meeting • Previous weeks action items • Review Sales Pipeline Report • Discuss bid/sold/pending projects vs. goals per salesperson. • Review all previous weeks leads • Discuss sales or estimating items • Short & Long term schedule • Sales education • Action Items

  16. Why Job Costing is Critical ? • Provides the most current information about your company. • Provides information for managers, not accountants. • Provides information that can be used as a management tool, for change. • Holds all employees accountable. • Reconnects the project process.

  17. Estimating System Review History With Estimator Production Information Review with Production / Sales Field Collection Of Production Info. Job Cost Reports Job Cost System JOB COST CYCLE

  18. Does your estimating system allow for proper Job Costing ? • Can your system break down the information for field measurement? • Is it detailed enough? • Can you track labor by function? • Can you track Equipment used? • Is it Consistent? • Can it be used for all project types? • Does it separate Direct & OH Costs? • Is profit a bid item?

  19. Material AP Labor Payroll OH Recovered Bid Vs. Actual Equipment Profit Subcontractor Job Costing

  20. Work daily completion. Labor • The only method I have found to ensure accurate and complete work daily information is to combine job costing and payroll information. • The foremen would fill out the work daily for the entire crew. • The information is then used both for payroll and job costing.

  21. Most work daily formats have a time card table. • This is used to mark down the start and end times for each person on the crew. • Any hours not paid, such as lunch, are deducted from the total. • For example: • An employee starting at 7 a.m. and finishing at 5 p.m. with a 30 minute lunch deduction would list 9 1/2 hours.

  22. The man hours are entered by operation code. • Adding up each employee’s time for each operation code would be the number of man-hours worked for the day. • These hours are exactly the same as payroll. Your employees become the best double check system for the accuracy of this information. • The information listed for each employee is then compared to the timecard section on the work daily. • These hours must match.

  23. It is unrealistic to track most landscape construction operations in less than 15 minute increments. • For other operations such as maintenance or chemical applications, smaller increments may be feasible. • If the crew is working on multiple projects, a different work daily is used for each project. • If a crew visits multiple sites every day, such as a mowing crew, a different work daily format is used.

  24. The work daily must be completed each day. • There is no way to know if the work daily is being completed each day unless it is handed in each day. • Do not let the foreman keep the work dailies until the payroll period ends or the project is completed. • The work daily should then be handed to a person with knowledge of the project for review. • This is usually the salesman or supervisor. • The work daily review should take place prior to the work daily being handed into the office.

  25. The work daily must be completed at the project site. • The accuracy and completeness of the information will decline significantly if the work daily is completed at a later time off site.

  26. Non Billable Hours • What is your % of non billable hours • Set up items as projects • Track OH items to measure time for: • Equipment maintenance, cleaning and repair • Facility maintenance • Inventory handling and maintenance • Meetings, Training, & Education • Punch-list & Repairs • Warranty not estimated or covered

  27. Job Cost reports • Project Profit • Bid vs Actual • By project • By foreman • By customer type • OH by function • Estimate review

  28. Job Costing Determines: • Most profitable job size range • Smallest / Largest project size • Crew size efficiency • Crew / Foreman strength & weakness • Project type by profit • Lead source by profit • Company Sweet Spot

  29. Job Costing for Improved Efficiency & Incentive Programs • Determines profit by project. • By Sales person • By Foreman • By Supervisor • By Division Manager • Track Non Billable hours • Track Equipment Costs and use • Track Material efficiency • Track tardiness per employee • Set crews up for success.

  30. Customer Communications: • This is a very common customer survey area or of weakness. • Pre-construction phase: • Changes to the schedule. • Preconstruction meeting. • Utility mark-out. • Finalize construction commencement date. • In progress phase: • Daily log e-mail or phone call. • Key project milestones. • On-site meetings. • 24 / 7 availability

  31. Post construction phase: • Final walk-through with a client. • Punch list completion. • Warrantee completion. • Potential project issues. • Cross sell other divisional work. • Project maintenance requirements. • Billing. • Detailed invoices as per contract. • Daily function. • No change order surprises.

  32. For smaller projects and service items, I would recommend a personal phone call. • Whenever possible the salesperson who should make this phone call. • A meeting with the client may not always be possible. • A letter or e-mail would be my last choice. • The letter or e-mail should be sent directly from the salesperson. • The project may have been small, but the referral may be large.

  33. Manage 360 Demo: • Job Tab • Reports • Work order • Job log • Materials • PO • List • Billing and % completion • Analysis • Actuals • Timesheet Entry • Job Cost Report

  34. Conclusion & Discussion Thank you for attending our “Landscape Job Costing and Project Management” Webinar Presented By : Marcus vandeVliet Consultant – MV Enterprises Phone: (302) 239-6612 marcusv@aol.com www.mventerprises.biz