Arizona Department of Administration. General Services Division. August 2012. Proudly Presents The. Construction Services Group Roger Berna, General Manager 602-542-6051 Bill Anderson 364-2366 Mike Rank 542-1983 Janet Collegio 542-1925 Alvin Spencer 542-0096

hanae
Télécharger la présentation

Arizona Department of Administration

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Arizona Department of Administration General Services Division August 2012 Proudly Presents The...

  2. Construction Services Group Roger Berna, General Manager 602-542-6051 Bill Anderson 364-2366 Mike Rank 542-1983 Janet Collegio 542-1925 Alvin Spencer 542-0096 Joe Grajeda 364-0776 John Webster 542-6229 Terry Gutman 542-1935 Clara Youngberg 542-6042 Jeff Pugh 542-0074

  3. Meet the Staff of Construction Services Roger Berna Janet Collegio Bill Anderson Terry Ann Gutman Jeff Pugh Joe Grajeda Alvin Spencer John Webster Clara Youngberg Mike Rank

  4. What we do…. Construction Services provides: Project Management Services for the design and construction of new facilities, renovations and major maintenance projects.

  5. Why choose the Construction Services (CS) Group to manage your construction project? • We understand the special nature of public sector projects. • We know what it takes to deliver those • projects successfully. • We have the experience; over $1.1 billion in total project value since our inception in 1985.

  6. Our staff knows how to coordinate with multiple user groups and decision makers to provide you with a management plan. As construction professionals directing the project team, we can provide a significant savings on the cost, while ensuring the quality and schedule of your project is maintained.

  7. Our Project Managers have the expertise in coordination and communications to complete construction “on time” and “within budget”.

  8. METHODS OF APPROACH

  9. Our key role is to represent your interests by: • Consulting on initial budgets or project approach. • Consulting on project scope definition. • Assisting in identifying and assessing risk. • Coordinating the planning, design, construction and other related facility activities required to make your project a success. • Providing you with personal attention by assigning a Project Manager to your project from startup to closeout. • Acting as your liaison throughout the project.

  10. BENEFITS OF CS GROUP ON YOUR TEAM

  11. Expertise in Construction Management • Expertise in coordinating the procurement of design and construction services • Thorough knowledge of the State construction statutes • Expertise in all forms of project delivery • Commitment to Customer Service • No project is too big or too small

  12. Cost Savings $ Construction Services’ management fees are based on “Salary and Expenses only,” which means more dollars dedicated to your project! $ We provide comprehensive project budget profiles, which include detailed budget accounting for all project costs, vendor payment, reconciliation, administration, cost accounting, and eliminate “surprises” and cost overruns, which also equates to substantial cost savings!

  13. $ The average fee for a Project Manager in the Valley is $150+ per hour $ Construction Services’ fee is only $55 per hour!

  14. Project Delivery Services Prior to commencement, Construction Services will advise you on the best method to design and construct your project to meet your budget and scheduled goals. Design-Bid-Build  Design-Build  Construction Manager @ Risk  Job Order Contracting  Architect/Engineer Services  Energy Performance Contracts

  15. Other Services… • Material Purchases • Invitation for Bid • Coordination of Emergency Procurement •  Recommendation for Award of Contract •  Requests for Proposals and/or Qualifications

  16. Construction Management •  Before work begins, we will coordinate all the necessary site investigations and environmental surveys. •  As work begins in the field, we will be your onsite representative. •  We will administer and oversee all construction. • We will manage the budget and maintain all records, logs and reports, and most importantly… • We will keep you informed on all progress and issues affecting the project.

  17. Commitment to Customer Service • Satisfied Customers •  Repeat Business •  Quick Response Time •  Our Surveys say…….

  18. CUSTOMER SURVEYOverall Satisfaction with Construction Services on a scale of 1 to 8

  19. CLIENT LIST

  20. Arizona Department ofAdministration (ADOA) • Arizona Department of Corrections (ADC) • Arizona Department of Health Service (AHS) • Arizona Department of Juvenile Corrections (ADJC) • Arizona Department of Veterans Services (ADVS) • Arizona Department of Transportation (ADOT) • Arizona State Hospital (ASH) • Arizona Historical Society (AZHS) • Arizona Department of Environmental Quality (ADEQ) • Arizona Department of Commerce • Arizona State Forestry Division (ASFD)

  21. Arizona School for Deaf and Blind – Tucson (ASDB) • Phoenix Day School for the Deaf – Phoenix (PSDS) • Arizona State Lottery (ASL) • Arizona Exposition & State Fair (AESF) • Arizona Department of Revenue (ADOR) • Arizona Supreme Court • Governor’s Office • Arizona Game and Fish (AZGF) • Office of Attorney General • Arizona Pioneers’ Home (APH) • Arizona Department of Economic Security (DES) • Arizona Department of Public Safety (DPS)

  22. SOME OF OUR PROJECTS • Executive Tower Emergency Power Panel $33,000 • Pioneers’ Home Women’s Ward Remodel $204,000 • DES 20,000 SF Remodel $670,000 • PDSD Kachina Classroom Remodel $107,000 • ASPC Perryville-Natural Gas Line Replacement $856,000 • Pioneers’ Home Asbestos Floor Replacement $38,000 • ADC Lewis Prison 4150 Bed Facility $220M • ADC Yuma Complex Cheyenne Unit $25M

  23. SOME OF OUR PROJECTS • ADC Douglas Wastewater Pipeline/Clarifier $3.7M • ADHS New Health Lab $30M • Arizona State Hospital Complex $67M • Arizona State Hospital Sexual Predator 60 Bed Bldg. $5.5M • Dept. of Agriculture Historic Preservation $2.7M • Capitol Executive Tower Renovation $3.1M • Weights & Measures Test Lab Remodel $516,000 • Capitol Museum Restoration $2M • DES Duct Replacement $388,000

  24. SOME OF OUR PROJECTS • Pioneers’ Home Plumbing Modernization $1.2M • ADC 1000 Bed Prison Project $24.3M • PDSD Transportation Bldg. $427,000 • Arizona State Supreme Court Re-Roof $550,000 • ADC Florence Prison Water Tank Upgrades $1M • ADOR Elevator Upgrades $1.45M • ADOR Restroom Upgrades $1.2M • ADOA Tucson Complex Chiller Upgrades $1M • AESF Coliseum Structural Roof Repairs $6.15M

  25. SOME OF OUR PROJECTS • PDSD High School/Middle School $13M • ASDB Vocational/Student Health Bldg-Tucson $6M • ADJC Arsenic Removal System $700,000 • DES Elevator Upgrades/Renovations $957,000 • ADOT Payson Equipment Shop $1.4M • ADC 4000 Bed Prison Expansion Project $200M • ADC Yuma New Reverse Osmosis Water Treatment Plant $5.2M • ADC Lewis Water Treatment Plant Upgrades/Well Equipment Repair & Replacement $1.735M

  26. SOME OF OUR PROJECTS • ADC Yuma Expansion of Wastewater Treatment Plant $11M • ADOT Employee Housing @ Grand Canyon Airport $2.5M • Arizona State Hospital/Forensic Hospital $32M • ADVS Phoenix Veterans’ Home Dining Room Expansion $750,000 • ADVS New Tucson Veterans’ Home $28.6M • Statewide American Recovery & Reinvestment Act (ARRA) of 2009 $4.6M

  27. SOME OF OUR PROJECTS • DPS Fire Alarm System Upgrades (Computer Room) $160,000 • ADC Florence Central Unit – Structural & Life Safety Analyses and Roof Replacement $350,000 • Arizona State Supreme Court Chiller Installation $1.7M • ADJC Adobe and Catalina Mountain School Renovations $2.9M • ADOT New AZ Transportation Research Center (ATRC) $250,000 • ADVS Phoenix Veterans’ Home Chiller Replacement $800,000

  28. SOME OF OUR PROJECTS • ASPC Lewis New Water Well #5 $2.3M • AZ Historical Society-Tempe Historical Society Museum Re-Roof $333,000 • Arizona State Hospital Replace Heat Exchange $190,000 • Arizona State Capitol Dome Repairs $300,000 • ADJC Replace HVAC Systems @ Adobe Mountain and Black Canyon Schools $260,000 • DPS Replace Chiller, Cooling Tower and HVAC Systems @ Forensics Sciences Lab $600,000 • AESF Cattle Barn Structural Roof Repairs and Roof Replacement $460,000

  29. SOME OF OUR PROJECTS • Arizona Forestry Division/Flagstaff Parking Lot Resurface and Office Renovations $130,000 • ADOA Replace Electrical Service Entrance @ Executive Tower $1.133M • AZ Prescott Historical Society-Sharlot Hall Museum Cooling Tower, Water Heater & Roof Replacement $225,000 • ADOA Tucson Office Complex Tucson Disaster Recovery Center New UPS and Backup Genset $228,000 • Building Renewal (Capital Maintenance/Repairs) for Fiscal Year 2013 $10M

  30. PHOTO ALBUM

  31. Arizona State Capitol DomeHail Damage RepairCompletion Dec 2011

  32. Arizona State Hospital ComplexNew Forensic 120 Bed Hospital Gilbane Building Companies Completion Sep 2011 New Forensic Site Excavation Ground Breaking Ceremony Nov. 2, 2009 (Main Hospital 120 Beds) Ground Opening Ceremony Oct. 5, 2011

  33. Arizona State Hospital ComplexNew Forensic 120 Bed Hospital Gilbane Building CompaniesCompletion Sep 2011 Aerial Sep 2011 Administrative Office Main Entrance Guard Station Hospital Entrance Administrative Office Patient Bathroom Security Control Room Patient Dayroom Semi-Private Patient Room Staff Work Area

  34. Arizona Department of Veterans ServicesNew AZ Tucson Veterans’ Home – 120 Bed FacilityCompletion Sep 2011

  35. Arizona Department of Veterans ServicesNew AZ Tucson Veterans’ Home – 120 Bed FacilityCompletion Sep 2011

  36. Arizona Department of Veterans ServicesNew Chiller and AHU Replacement, Phoenix, AZCompletion Aug 2011 Chiller Piping Chiller Piping 1 of 2 Air Handler Units 1 of 2 Air Handler Units

  37. Arizona State Supreme Court - Chiller Installation1501 W. Washington, Phoenix, AZCompletion May 2011 Lifting Chiller to Set in Basement Circulation Pumps Lifting Chiller Over Wall to Set in Basement 1 of 3 New Chillers in Place

  38. Arizona School for Deaf and Blind – TucsonManzanita Dorm Fire RemodelCompletion Jun 2010

  39. Arizona Department of TransportationBurnt Wells Rest Area Residence Renovations I-10, Mile Post 86Completion Jun 2010

  40. Arizona Department of RevenuePassenger Elevator ModernizationCompletion Mar 2010

  41. Arizona Department of Veterans ServicesAZ Veterans’ Home - Dining Room ExpansionCompletion Feb 2010

  42. ADC 4000 Bed Prison Expansion ProjectASPC Perryville (1000 Bed)Completion Feb 2010McCarthy Building Companies San Carlos Unit Prototypical Dental Office Prototypical Kitchen Prototypical Housing Dorm Prototypical Visitation Area

  43. ADC 4000 Bed Prison Expansion ProjectASPC Tucson (1000 Bed)Completion Feb 2010McCarthy Building Companies Whetstone Unit Prototypical Showers Prototypical Kitchen Officers’ Control Room Prototypical Washroom Prototypical Dormitory Officers’ Station Prototypical Kitchen Office

  44. ADC 4000 Bed Prison Expansion ProjectASPC Yuma (2000 Bed) Completion Feb 2010McCarthy Building Companies La Paz and Cibola Units 1000 Beds Each Pedestrian Sallyport Prototypical Control Room Prototypical Laundry Prototypical Dining Room

  45. ADC 4000 Bed Prison Expansion ProjectASPC Yuma Water Treatment Plant Completion Feb 2010McCarthy Building Companies Finished Water Pump Station Chemical Feed System Raw Water Pump Station Reverse Osmosis System

  46. ADC 4000 Bed Prison Expansion ProjectASPC Yuma Wastewater Treatment Plant Completion Feb 2010 McCarthy Building Companies Alkalinity Feed System & Headworks Clarifier & Operations Bldg. New Effluent Storage Pond

  47. Arizona Department of Transportation (ADOT)Grand Canyon Employee Housing Completion Feb 2009

  48. Phoenix Day School for the Deaf High School/Middle School Completion Jul 2008

  49. Arizona Dept Juvenile Corrections Arsenic Removal System Installation Completion Nov 2007

  50. Other Construction Projects 2012 Sharlot Hall Museum Cooling Tower Replacement AESF AZ Veterans Coliseum Cattle Barn Bldg. Roof Replacement Tucson Office Complex Solar Photovoltaic State Forestry Div. Flagstaff-Resurface Parking Lot & Siding Replacement ADC Florence Cell Block 2 Structural Repairs ASH Cooling Tower Repair and Replacement ADOT CCP Office Remodel ADJC Adobe Mountain and Black Canyon Schools HVAC Replacement ADOT Admin Bldg Roof Replacement ADOT Kingman Yard Sewer Conversion