1 / 21

Trip Report on the visit to ICST of HIT, Harbin, China

Trip Report on the visit to ICST of HIT, Harbin, China. Derun Li Mike Green Steve Virostek Mike Zisman Lawrence Berkeley National Laboratory. (from December 12 to December 16, 2006) January 11, 2007. Abbreviations. ICST I nstitute of C ryogenics and S uperconducting T echnology

harken
Télécharger la présentation

Trip Report on the visit to ICST of HIT, Harbin, China

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Trip Report on the visit to ICST of HIT, Harbin, China Derun Li Mike Green Steve Virostek Mike Zisman Lawrence Berkeley National Laboratory (from December 12 to December 16, 2006) January 11, 2007

  2. Abbreviations • ICST Institute of Cryogenics and Superconducting Technology (new Institute and was formed in 2001) • HIT Harbin Institute of Technology (one of the top engineering universities in China http:www.hit.edu.cn) Derun Li - Lawrence Berkeley National Laboratory

  3. Purpose of the Visit • Collaboration on MICE Coupling Coils • Engineering Designs • Fabrications • Integration and interface with RFCC modules • Budget: ICST submitted proposal to HIT asking for help • Collaboration plan and schedule • Tour of ICST • Meetings with ICST staffs • Machine shops on campus and Harbin city Derun Li - Lawrence Berkeley National Laboratory

  4. Agenda of the Visit at ICST (3.5 days) • Presentations by visitors • M. Zisman: Introduction on Neutrino Factory and MICE • D. Li: MICE RFCC module and RF cavities • M. Green: SC magnets and MICE coupling coils • S. Virostek: MICE cooling channel, mechanical designs, collaboration plans and schedules • Presentations by ICST staffs • Engineering designs progress and simulation results • Discussions with ICST staffs & meetings with HIT officials • Tours of HIT campus machine shops Derun Li - Lawrence Berkeley National Laboratory

  5. Visits of IHEP, Beijing • M. Green visited IHEP before going to Harbin • Presentations on SC magnets • Discussions with IHEP SC magnet staffs • Tour of the IHEP labs and their fabrication capabilities • Experiences of collaborations between IHEP and ICST of HIT • D. Li visited IHEP after the Harbin trip • Introduction of MICE coupling coils and RFCC modules • More discussions with IHEP SC magnet group staffs • Tour of IHEP SC magnet labs and BEPC-II site Derun Li - Lawrence Berkeley National Laboratory

  6. MICE Cooling Channel Derun Li - Lawrence Berkeley National Laboratory

  7. MICE RF Cavity & Coupling Coil Module Coupling Coil Derun Li - Lawrence Berkeley National Laboratory

  8. RFCC Module 2-D Layout Pulse Tube Cryocooler RF Cavities Coupling Coil RF Cavity Vacuum Vessel Vacuum Manifold 8” Cryopump Derun Li - Lawrence Berkeley National Laboratory

  9. Goals of the ICST/LBNL Collaboration • Develop a coupling coil design for MICE, MuCool • Preferably one design that meets both project’s needs • Fabricate and test three coupling coils at ICST • Coil for MuCool is needed as soon as possible • Two MICE coils can follow later (if appropriate) • Integrate the coil design with the requirements of the MICE RF/Coupling Coil Module • Issues: RF vacuum vessel, RF couplers, tuners, forces Derun Li - Lawrence Berkeley National Laboratory

  10. LBNL Role in the Coil Development • Develop engineering concept & initial analysis • Specification of coil parameters & requirements • Provide project oversight and design approval • Procurement of superconductor, cryocoolers, leads, power supplies, etc. for all three coils • Funding to ICST for added cost of MuCool coil • Additional material: coil winding form, cryostat, coil vacuum vessel, MuCool coil support structure Derun Li - Lawrence Berkeley National Laboratory

  11. ICST Role in the Coil Development • Perform engineering analyses and detailed design of the MICE/MuCool coupling coil • Fabricate & test one MuCool coil with funding, material and components provided by LBNL • Provide effort and material to complete the fabrication and testing of the two MICE coils • Contribute to the collaboration by reporting progress at MICE meetings and in publications Derun Li - Lawrence Berkeley National Laboratory

  12. Coupling Coil Specification • General system description • Applicable codes and standards • Coil parameters and requirements • Inspection and testing plans • Packing, shipping and handling • List of LBNL furnished materials • Quality assurance requirements • Conceptual design drawings Derun Li - Lawrence Berkeley National Laboratory

  13. Project Milestones • Completion of coil design, analysis and drawings • Final design review to be prepared by ICST • Complete coil winding with quench protection • Fabricate and assemble coil cryostat • Fabricate lead and vacuum feedthroughs • Fabricate cryocooler interface & recondensers • Procure & fabricate cold mass suspension parts • Perform final assembly: cryostat, leads, supp’ts • Coil acceptance testing & shipping preparation Derun Li - Lawrence Berkeley National Laboratory

  14. Project Deliverables from ICST • Design package containing fabrication drawings • One MuCool coil with dedicated support (ASAP) • Two coupling coils for the MICE Project • Fabrication process documentation • Magnet testing documentation • Coupling coil project final report Derun Li - Lawrence Berkeley National Laboratory

  15. Coupling Coil Design Review • Coupling coil design review to be held by ICST • Attendees: LBNL, MICE collaborators, other experts • Complete design package documentation to be provided • Follow up on issues & actions items identified in review • Present engineering analyses and calculations • All fabrication drawings ready for review • Fabrication and assembly plans and procedures • Coil test plans: electrical, thermal, mechanical • Quality assurance and process control plans Derun Li - Lawrence Berkeley National Laboratory

  16. Inspection, Testing and Acceptance • Travelers documenting fabrication processes • Material certs, He & vacuum vessel weld checks • Winding & potting records, wire & pin checks • He & vacuum vessel pressure & vacuum checks • Polarity & voltage checks, insulation inspection • Cold mass surveying and support force check • Warm and cold coil magnetic field checks • Magnet cryogenic test, quench test and training Derun Li - Lawrence Berkeley National Laboratory

  17. Quality Assurance Planning • Process control, inspection and testing • Process documentation • Detailed fabrication and inspection plan • Cleaning, welding and leak check procedures • Cold shock and any other QA test methods • Document and data control • Management responsibility • Project planning (work breakdown structure) • LBNL monitoring and oversight Derun Li - Lawrence Berkeley National Laboratory

  18. Timeline – Parallel Coil Fabrication Derun Li - Lawrence Berkeley National Laboratory

  19. Timeline – Early MuCool Coil Delivery Derun Li - Lawrence Berkeley National Laboratory

  20. Fabrication Plan Summary • LBNL to provide design concept & specification • ICST to develop detailed coupling coil design • Engineering analyses and design drawings • Design review to be held prior to fabrication • LBNL will supply some components and material • Superconductor, cryo-coolers, power supplies, etc. • ICST will fabricate and test the coupling coils • LBNL will oversee the design and fabrication Derun Li - Lawrence Berkeley National Laboratory

  21. Concluding Comments • A very successful visit • Impressed by the fabrication capability at HIT • In collaboration with ICST, we are confident on the technical and fabrication capability of making the MICE coupling coils a success • Funding from HIT is critical for the coupling coils • MICE collaboration support is also needed • Travels, membership fee and etc.. • Thanks to ICST, Drs. Jia and Wang, and their staffs for hosting us and also for their contributions to MICE Derun Li - Lawrence Berkeley National Laboratory

More Related