1 / 68

Timeframe

NFPA 1730 Standard on Organization and Deployment of Fire Prevention Inspection and Code Enforcement, Plan Review, Investigation, and Public Education Operations to the Public. Timeframe. June 22-25, 2015 Chicago, IL. Public Comment link. Draft link. Organization.

Télécharger la présentation

Timeframe

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NFPA 1730Standard on Organization and Deployment of Fire Prevention Inspection and Code Enforcement, Plan Review, Investigation, and Public Education Operations to the Public

  2. Timeframe June 22-25, 2015 Chicago, IL

  3. Public Comment link Draft link

  4. Organization Chapter 1 Administration Chapter 2 Referenced Publications Chapter 3 Definitions Chapter 4 Organization Chapter 5 Community Risk Assessment Chapter 6 Fire Inspection and Code Enforcement

  5. Organization Chapter 7 Plan Review Chapter 8 Investigation Chapter 9 Public Education Annex A Explanatory Material Annex B Community Risk Assessment Guide Annex C Sample Staffing Exercise

  6. Scope • Minimum requirements relating to the organization and deployment of fire prevention inspection and code enforcement, plan review, investigation, and public education operations to the public. • Address functions and objectives of fire prevention organizations (FPO) service delivery, capability and resources. • Addresses the strategic and policy issues involving the organization and deployment of a fire prevention programs and does not address methods for carrying out specific fire prevention services, activities and programs.

  7. Purpose • Specify the minimum criteria addressing the effectiveness and efficiency of the public FPO of fire prevention inspection and code enforcement, plan review, investigation, and public education operations to the public by fire departments and other organization. • Nothing herein is intended to restrict any jurisdiction from exceeding these minimum requirements.

  8. This program will/will not provide • Inspection Frequency • Hard Numbers • 1 per ?? population • 1 per ?? square miles • 1 per ?? structures • 1 per ?? square feet • 1 per ?? ??

  9. Definitions • Normal NFPA Definitions • Fire Prevention Organization (FPO). The organization having authority to provide fire prevention, inspection and code enforcement, plan review, investigation and fire and life safety education.

  10. Chapter 4 - Organization • The AHJ shall maintain a written statement or policy that establishes the following: • Existence of the FPO • Services that the FPO will provide • Basic organizational structure • Expected number of FPO members • Functions that FPO members are expected to perform.

  11. Fire Prevention Organization • The FPO organizational statement shall provide service delivery objectives, including specific objectives for each major service component.

  12. Organizational Structure • The FPO shall have a leader and an organizational structure that facilitates efficient and effective management of its resources to carry out its mandate. • The FPO shall have an organizational structure of the size and complexity required to accomplish its mission.

  13. Management Information System (MIS) • The FPO shall develop a MIS for the FPO. • A MIS shall be maintained to support the management of the FPO by providing the leaders with data that indicate the effectiveness of the organization in its programs and procedures.

  14. Management Information System (MIS) • Incident records shall be reviewed each year. • The MIS shall maintain a history of services delivered and performance outcomes as measured against goals established through the organizational statement.

  15. Finance • Responsibility for the functions of budget control shall fall under the direction of the FPO leader. • reflect and support the organization’s goals, objectives, and expected outcomes. • record of funds received and expended. • records of purchases • data available for the actual cost estimates needed for planning and budgeting purposes.

  16. Records • Record-keeping practices shall be developed, instituted, and maintained in accordance with nationally recognized standards, as well as federal, state or provincial, and local requirements. • The FPO shall publish an annual report.

  17. Community Risk Assessment • The FPO shall conduct a community risk assessment (CRA) (see Chapter 5). • The CRA shall be reviewed at a minimum of once every 5 years or more frequently when changes take place that affect the original assessment.

  18. Community Risk Assessment • The CRA shall be distributed to agencies, departments, and employees having responsibilities designated in the plan. • A record shall be kept of all holders of the CRA. • A system shall be implemented for issuing all changes or revisions of the CRA to all holders.

  19. Community Risk Reduction Plan • Developed based on the CRA • Identifies programs and resources priorities

  20. Personnel • The resources and personnel required to provide the level of service(s) outlined within 4.1.1 shall be determined by the FPO or by the authority having jurisdiction. • The FPO shall examine opportunities to utilize all personnel for activities within the standard.

  21. Process to Determining Staffing Levels Step 1. Scope of Services, Duties, and Desired Outputs. Step 2. Time Demand. Step 3. Required Personnel Hours. Step 4. Personnel Availability and Adjustment Factor. Step 5. Calculate Total Personnel Required.

  22. Training • The FPO shall have training and education programs and policies to ensure that personnel are trained and that competency is maintained in order to effectively, efficiently, and safely execute all responsibilities. • The FPO leadership shall coordinate training, maintain training records, and assist in evaluating the effectiveness of the program.

  23. Policies • The AHJ shall develop, establish and implement policies and procedures to ensure compliance with this standard.

  24. Chapter 5Community Risk Assessment • Scope. This chapter shall establish a process to identify and analyze community risks that impact the services outlined by the FPO in section 4.1.1. • Purpose. The purpose is to assist in the development and implementation of a Community Risk Reduction (CRR) Plan and programs to reduce, mitigate or eliminate the community’s risks.

  25. Community Risk Assessment • The FPO shall conduct a Community Risk Assessment (CRA) to identify the needs and the circumstances of the community and to establish the level of fire prevention activities. • See Appendix B for guidance on conducting a Community Risk Assessment.

  26. Community Risk Assessment • The Community Risk Assessment shall be conducted every five (5) years or more frequently based on community need. • An annual review of the FPO’s loss and injury statistics shall be conducted to identify emerging trends which may impact the current CRR Plan and risk reduction programs.

  27. Community Risk Assessment • The Community Risk Assessment shall include the following profiles to describe the community: • Demographic • Geographic • Building stock • Fire • Responses • Hazards • Economic

  28. Community Risk Assessment • Demographic Profile describes the composition of the community’s population using various categories such as age, gender, cultural backgrounds, language barriers, educational attainment, socioeconomic makeup, transient populations and other considerations specific to a local community. • Geographic Profile describes the physical features of the community. Consider the nature and placement of features such as waterways, highways, canyons, railroads, wild-land interface, landforms, and bridges.

  29. Community Risk Assessment • Building Stock Profile describes the various occupancy classification types and numbers of buildings including mixed occupancies in the community. It is important to identify high-risk occupancies. • Fire Profile describes the community’s past fire experience and trends and how the community’s experience compares to statewide and national trends. Data on fire deaths, injuries, cause and dollar loss are important components of a fire profile. State and national statistics may assist in providing data.

  30. Community Risk Assessment • Response Profile describes the types of emergencies to which the organization responds. • Hazard Profile describes the natural, human-caused, and technological hazards. • Economic Profile describes the economic sectors affecting the community that are critical to its financial sustainability.

  31. Community Risk Assessment • The FPO shall analyze the profile data and identify risks facing the community. • The FPO shall identify and seek out stakeholders and employ an inclusive process to solicit input on the risks facing the community. • The FPO shall revise the identified risks as necessary in accordance with the input process.

  32. Community Risk Assessment • The FPO shall categorize the risks based on their probability and impact. *A risk assessment matrix classifies a community’s risks based on probability and impact. This is a tool that can be used to create a visual representation of the risks in the community.

  33. Community Risk Assessment • The FPO shall conduct a needs analysis on the risks and identify strategies to include in a Community Risk Reduction (CRR) Plan.

  34. Community Risk Assessment • The FPO shall: • Develop a CRR Plan that identifies program and resource priorities that will reduce a community’s risks consistent with section 4.1.1. • Obtain administrative approval of the CRR Plan. • Develop the risk reduction programs. • Allocate resources for risk reduction programs.

  35. Community Risk Assessment • The FPO shall assess the performance of the risk reduction programs on an ongoing basis to evaluate efficiency and effectiveness and modify programs accordingly.

  36. Community Risk Assessment Community Risk Reduction Plan Development Community Risk Reduction Plan Implementation and Evaluation Community Risk Assessment, Planning and Implementation Process Chart

  37. Chapter Organization • Scope • Purpose • CRA • Qualifications • Required Personnel

  38. Chapter 6Fire Prevention Inspection and Code Enforcement • This chapter shall establish the organization and deployment of fire prevention resources for fire prevention inspection and code enforcement activities in existing occupancies.

  39. Fire Prevention Inspection andCode Enforcement Activities • Fire prevention inspection and code enforcement services, including department personnel, equipment, and all support and resources, shall be structured to meet the organizational objectives required by Chapter 4. • New construction or renovation inspections are contained in Chapter 7.

  40. Fire Prevention Inspection and Code Enforcement Activities • The purpose of this chapter is to specify the minimum frequencies for fire prevention and code enforcement inspections and the minimum staff necessary to perform these inspections in existing occupancies. • Fire prevention inspection and code enforcement shall be conducted to ensure compliance with locally adopted codes and standards.

  41. Fire Prevention Inspection and Code Enforcement Activities Minimum Inspection Frequency Occupancy Risk Classification Frequency High Annual Moderate Biennial Low * Triennial Critical infrastructure Per AHJ

  42. Definitions from Chapter 3 • Critical Infrastructure - The assets, systems, and networks, whether physical or virtual, that are so vital to the community that their damage or destruction would have a debilitating effect.

  43. Occupancy Definition Chapter 3 • Low-Risk Occupancy – An occupancy that has a history of low frequency of fires and minimal potential for life and economic loss. (storage, mercantile, business) • Moderate-Risk Occupancy – An occupancy that has a history of moderate frequency of fires or a moderate potential for life or economic loss. (ambulatory health care, industrial)

  44. Occupancy Definition Chapter 3 • High-Risk Occupancy – An occupancy that has a history of • high frequency of fires; or • high potential for life loss; or • high potential for economic loss; or • an occupancy that has a low or moderate history of fires or life loss but the occupants have a high dependency on the built-in fire protection features or staff to assist in evacuation in time of fire or emergency (apartment buildings, hotels, dormitories, lodging and rooming, assembly, child care, detention, educational, health care)

  45. Chapter 7 - Plan Review • This chapter shall establish the organization and deployment for plan reviews and field acceptance inspections • This chapter identifies the tasks necessary to complete initial plan reviews through to the certificate of occupancy.

  46. Plan Review • The purpose of this chapter is to establish the organization and deployment for the FPO as it relates to plan review for emergency vehicle access, water supply, new construction, change of occupancy use, renovations, change or addition of fire and life safety systems, and associated acceptance field inspections. • Code enforcement inspection in existing occupancies are contained in Chapter 6.

  47. Plan Review • Plan review times can be determined based on project square footage based on occupancy and complexity. • Field inspection times can be determined by doubling the plan review times.

  48. Plan Review Time Services Table • Modifiers • number of sprinkler heads • number of fire alarm devices • special extinguishing systems

  49. Minimum plan review elements • Initial Fire Protection Environmental Impact (Feasibility Study) • Water Supply & Fire Flow • Emergency Vehicle Access • Construction Building Plans related to Fire Protection Features • Certificate of Occupancy Inspections • Hazardous Materials and Processes • Fire Protection System Plans • Fire & Life Safety Systems Field Acceptance Inspections • Certificate of Occupancy Issued

  50. Chapter 8 - Investigations • This chapter shall establish the organization and deployment for investigation activities. • The investigation of the origin, cause, and circumstances of any fire, explosion, hazardous materials incident or other hazardous condition shall be structured to meet the organizational objectives required by Chapter 4.

More Related