This report examines the conditions of a riverbank and its channel before and after the high river flows observed in January 2002 and January 2005. Initially, the project aimed for minimal disturbance to the riverbed, with observed features including the height of piles and the absence of vegetation along the riverbank. By 2005, significant changes were documented, including the accumulation of debris on structures, slow-moving waters at the bank, and the emergence of trees among the piles. These changes highlight the river's evolving ecosystem and the impact of hydrological events.
E N D
January 2002 Upon Completion Note minimal disturbance of riverbed and main river channel next to tall river bank. January 2005 After high river flows Note debris caught on pile retard system, slow moving water at riverbank, trees starting to grow among piles and main channel moved away from tall riverbank.
January 2002 Upon Completion Note minimal disturbance of riverbed, height of piles, lack of trees and main river channel next to tall riverbank. January 2005 After high river flows Note piles covered and trees along bank.