June 4, 2014 | Holyoke, ma. Abimael Santana. Engineer, resource analysis and integration. DRWG. Recent Changes in FCTS: Monitored CPS Screens. Summary of Changes. Project-level non-commercial/commercial capacity information

hayden
Télécharger la présentation

June 4, 2014 | Holyoke, ma

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. June 4, 2014 | Holyoke, ma Abimael Santana Engineer, resource analysis and integration DRWG Recent Changes in FCTS: Monitored CPS Screens

  2. Summary of Changes • Project-level non-commercial/commercial capacity information • Allocation of audit results to determine partial or full completion of projects on CPS monitoring

  3. Non-Commercial and Commercial Capacity Information • Additional information is now available for a project that is on critical path schedule monitoring • The following characteristics will be visible in FCTS for summer and winter values (DRV): • Non Commercial Capacity MW: Capacity remaining to be delivered to achieve full completion of the project • Terminated Capacity MW: Termination of the project’s non-commercial capacity (Tariff sections III.13.3.4(c) and III.13.3.6) • Commercial Capacity MW: Capacity demonstrated in an audit, exceeding the resource’s most-recently established commercial capacity, and attributed to the project

  4. Non Commercial/Commercial Capacity

  5. Monitored Capacity Allocation • Initially, the project is entirely non-commercial • As the resource performs audits, capacity moves from non-commercial to commercial • If the project, or a portion of it, is terminated, the amount moves to the terminated component

  6. Allocation of Audit Results • Audit results will be allocated to projects on CPS monitoring as follows: • The commercial capacity increase is calculated based on the commercial values for the current Capacity Commitment Period • For resources with multiple projects, the increase is allocated in chronological order based on when the project was approved • Summer audit results apply to both summer and winter DRV • Winter audit results apply to winter DRV only • Project is deemed complete when its summer non commercial capacity has been reduced to zero