PEREKAYASAAN PEJABAT DAERAH DAN TANAH KINTA BATU GAJAH

PEREKAYASAAN PEJABAT DAERAH DAN TANAH KINTA BATU GAJAH PERMIT BAHAN BATUAN (PASIR SUNGAI,EKSTRAKSI AIR DAN LTS BERCANTUM PERMIT). Profil Projek. Proses Kerja Semasa (As-Is) Permit Bahan Batuan (Pasir Sungai,Ekstraksi Air dan LTS bercantum Permit).

hayden
Télécharger la présentation

PEREKAYASAAN PEJABAT DAERAH DAN TANAH KINTA BATU GAJAH

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PEREKAYASAAN PEJABAT DAERAH DAN TANAH KINTA BATU GAJAH PERMIT BAHAN BATUAN (PASIR SUNGAI,EKSTRAKSI AIR DAN LTS BERCANTUM PERMIT)

  2. ProfilProjek

  3. Proses Kerja Semasa (As-Is) Permit Bahan Batuan (Pasir Sungai,Ekstraksi Air dan LTS bercantum Permit) 1. Hantarpermohonan 4. Ambilresit & BuatBayaran MP : 5mt 6. Terimaresit & hantarke PT (P/O) MP :5mt 5 mm 5 mm 5 mm 7. TerimaresithantarkePelukisPelan MP : 10 mt 5 mm 2. Terima & SemakmengikutSenaraiSemak MP: 5 mt 5 mm 3. KeluarkanResit MP:5 mt 5 mm 11. Buka fail MP : 10 mt 9. Terimalaporanawal MP : 10 mt 5 mm 5 mm 5. Terimabayaran & cetakresit MP: 5 mt 5 mm 5 mm 5 mm 10. Semakdanterima / tolak MP: 10 mt 12. Hantaruntuklaporan charting MP: 10 mt A 14. SemakLaporanAwal MP: 30 mt 5 mm 8. LaporanAwal MP: 30 mt 13. LaporanAwal MP: 30 mt 5 mm MP: 165 mt MM: 65 mt

  4. Proses Kerja Semasa (As-Is) Permit Bahan Batuan (Pasir Sungai,Ekstraksi Air dan LTS bercantum Permit) 18 . PenyediaanKertas MMK MP: 20 mp 15. Mintakulasandaripadajabatanteknikal (14 hari) MP: 20 mt 5 mt 26. Buatsuratkelulusan MP: 20 5 mm 16. Terima fail, siasat & sediakanLaporan Tanah & hantarke PT (P/O) MP: 960 mt (2 hari) 5 mm 5 mm 5 mm A 25. Untukpengeluaransuratmakluman MP: 20 5 mm 19 . SemakKertas MMK MP: 20 mp 17. TerimaLaporan Tanah danulasanjabatanteknikal MP: 60 mt 5 mm 5 mm 20 .Semak & perakuankertas MMK MP: 20 mp 24. Untukmakluman MP: 20 mp 5 mm 5 mm 21. TandatangandanHantarkertas MMK ke PTG untukkelulusanexco MP: 20 mp 120 mt 22. Keputusan? 120mt 23. Terimakepuitusan MMK (lulus) MP: 20 mp 6720 mm 15. Tunggulaporandaripadajabatanteknikal (14hari) 63360 mm MP: 1200 mt MM: 70370 mt

  5. Proses Kerja Semasa (As-Is) Permit Bahan Batuan (Pasir Sungai,Ekstraksi Air dan LTS bercantum Permit) 29. Terimasurat lulus danhantarke PT (P/O) 33. Terimaresit & hantarke PT (P/O MP :5mt) 37. TerimaLesendandoket 31. Buatbayaran MP : 10mt 5 mt 2400 mt 5 mt 5 mt 36. LesenkePemohon MP: 5 mt 5 mt 30. Semak & sediakanresitbayaran MP: 10 mt 34. Terimaresit & SediakanLesendandoket / cap doket MP: 30 mt 5 mt 5 mt 28. Hantarsuratkepadapemohon MP: 10 mt 32. Terimabayaran & cetakresit MP: 10 mt 5 mt 5 mt 5 mt 27.Semak dantandatangansuratkelulusan MP: 10 mt 35. T/T LesendandoketolehPentadbir Tanah MP: 30 mt B Jumlah Besar MP: 1485 mt / 3 hari MM: 72880 mt / 152 hari MP: 120 mt MM: 2445 mt

  6. Value Analysis of Process (1/3) Rule of Thumb: CVA and BVA – Simplify, Combine and Optimize NVA – Eliminate Interval – Eliminate or optimize

  7. Value Analysis of Process (2/3)

  8. Cadangan Penambahbaikan Permit Bahan Batuan (Pasir Sungai,Ekstraksi Air dan LTS bercantum Permit) 1. Hantarpermohonan 4. Ambilresit & BuatBayaran MP : 5mt 6. Terimaresit & hantarke PT (P/O) MP :5mt 5 mm 5 mm Gabungkanlangkah 7 dan 11 5 mm 7. TerimaresithantarkePelukisPelan MP : 10 mt 5 mm 2. Terima & SemakmengikutSenaraiSemak MP: 5 mt 5 mm 3. KeluarkanResit MP:5 mt Gabungkanlangkah 2 dan 3 5 mm 11. Buka fail MP : 10 mt 9. Terimalaporanawal MP : 10 mt 5 mm Hapuskanlangkah 8,9 dan 10 5 mm 5. Terimabayaran & cetakresit MP: 5 mt 5 mm 5 mm Hapuskanlangkah 12 5 mm 12. Hantaruntuklaporan charting MP: 10 mt 10. Semakdanterima / tolak MP: 10 mt A 14. SemakLaporan charting MP: 30 mt 5 mm 8. LaporanAwal MP: 30 mt 13. Laporan Charting MP: 30 mt 5 mm MP: 165 mt MM: 60 mt

  9. Cadangan Penambahbaikan Permit Bahan Batuan (Pasir Sungai,Ekstraksi Air dan LTS bercantum Permit) ) 18 . PenyediaanKertas MMK MP: 20 mp 15. Mintakulasandaripadajabatanteknikal (14 hari) MP: 20 mt 5 mt 26. Buatsuratkelulusan MP: 20 5 mm 16. Terima fail, siasat & sediakanLaporan Tanah & hantarke PT (P/O) MP: 960 mt (2 hari) 5 mm 5 mm 5 mm A Hapuskanlangkah 19 25. Untukpengeluaransuratmakluman MP: 20 5 mm 19 . SemakKertas MMK MP: 20 mp 17. TerimaLaporan Tanah danulasanjabatanteknikal MP: 60 mt 5 mm Hapuskanlangkah 24 5 mm 20 .Semak & perakuankertas MMK MP: 20 mp 24. Untukmakluman MP: 20 mp 5 mm 5 mm 21. TandatangandanHantarkertas MMK ke PTG untukkelulusanexco MP: 20 mp 120mt 120 mt 22. Keputusan? 63360 mp SingkatkanLangkah 22 23. Terimakeputusan MMK (lulus) MP: 20 mp 15. Tunggulaporandaripadajabatanteknikal MP: 6720mt (14hari) MP: 71280 mt MM: 290 mt

  10. Cadangan Penambahbaikan Permit Bahan Batuan (Pasir Sungai,Ekstraksi Air dan LTS bercantum Permit) Gabungkanlangkah 29 dan 31 29. Terimasurat lulus danhantarke PT (P/O) 33. Terimaresit & hantarke PT (P/O MP :5mt) 37. TerimaLesendandoket MP :5mt 31. Buatbayaran MP : 10mt 5 mt 2400 mt 5 mt 5 mt 36. LesenkePemohon MP: 5 mt 2400 mt 30. Semak & sediakanresitbayaran MP: 10 mt 34. Terimaresit & SediakanLesendandoket / cap doket MP: 30 mt Hapuskanlangkah 30 5 mt 5 mt 28. Hantarsuratkepadapemohon MP: 10 mt 32. Terimabayaran & cetakresit MP: 10 mt 5 mt 5 mt 5 mt 27.Semak dantandatangansuratkelulusan MP: 10 mt 35. T/T LesendandoketolehPentadbir Tanah MP: 30 mt B Jumlah Besar MP: 71570 mt / 149 hari MM: 5190 mt / 10 hari MP: 125 mt MM: 4840 mt

  11. Proses Kerja Semasa (To Be) (Pasir Sungai,Ekstraksi Air dan LTS bercantum Permit) 1. Hantarpermohonan 3. Ambilresit & BuatBayaran MP : 5mt 5. Terimaresit & hantarke PT (P/O) MP :5mt 5 mm 2. Terima & Semakdankeluarkanresit MP: 5 mt 6. Terimaresit, daftarkanpermohonan/buka fail danhantarkePelukisPelan MP : 10 mt 5 mm 5 mm 5 mm 5 mm 4. Terimabayaran & cetakresit MP: 5 mt 5 mm 8. Semak, minitdanberikepada PT(P/O) dan fail ke PPT MP: 5 mt 5 mm A 7. Laporan Charting MP: 20 mt 5 mm MP: 55 mt MM: 40 mt

  12. Proses Kerja Semasa (To Be) (Pasir Sungai,Ekstraksi Air dan LTS bercantum Permit) 19. Terimasurattolakatau lulus B 12 . PenyediaanKertas MMK MP: 20 mp 9. Mintakulasandaripadajabatanteknikal (14 hari) MP: 10 mt 960 mm 10 mm 18. Keluarkansuratmaklumantolakatau lulus kepadapemohonbersamaresitbayaran (MP : 20 mp) 5 mm 10. Terima fail, siasat & sediakanLaporan Tanah & hantarke PT (P/O) MP: 960 mt (2 hari) 5 mm 5 mm 5 mm A 5 mm 17. Untukpengeluaransuratmaklumandansalinankepada KPPDT MP: 10 mp 11. TerimaLaporan Tanah danulasanjabatanteknikal MP: 60 mt 13 .Semak & perakuanKertas MMK untukkelulusan MP: 20 mp 5 mm 5 mm 15. Keputusan 120 mm 14. Hantarkertas MMK ke PTG untukkelulusanexco MP: 20 mp 120 mm 16. Terimakeputusan MMK (lulus) MP: 10 mp 9. Tunggulaporandaripadajabatanteknikal (14hari) 6720 mm 21120 mm MP: 1130 mt MM: 29085 mt

  13. Proses Kerja Semasa (To Be) (Pasir Sungai,Ekstraksi Air dan LTS bercantum Permit) 20. Hadirke PDT bersamasuratkelulusandanbuatbayarandikaunterhasil (10 mt) 22. Terimaresit & hantarke PT (P/O) MP :5mt) 26. TerimaLesen 5 mt B 5 mt 25. SerahLesenkePemohon MP: 5 mt 23. Terimaresit & SediakanLesen MP: 30 mt 5 mt 21. Terimabayaran & cetakresit MP: 10 mt 5 mt 5 mt 5 mt 24. T/T LesenolehPentadbir Tanah MP: 30 mt Jumlah Besar MP: 1275 mt / 3 hari MM: 29155 mt / 61 hari MP: 90 mt MM: 30 mt

  14. Value Analysis of Process (1/3)

  15. Value Analysis of Process (2/3)

  16. PerbandinganSebelumdanSelepas

  17. RingkasanPenemuandanCadanganPenambahbaikan

  18. RingkasanPenemuandanCadanganPenambahbaikan