1 / 10

Virtual-Reality Maze

This report outlines the development of a virtual reality maze project utilizing multi-touch screen technology and motion sensors. Key features include a Bluetooth GPS and e-compass integration, XML-type map data, and the ability to render both 2D and 3D environments. The project timeline details phases such as 3D scene rendering, Bluetooth device connections, and testing methodologies, culminating in a comprehensive game logic design. The report aims to showcase the innovative aspects of our project and provide insights for future enhancements.

hayley
Télécharger la présentation

Virtual-Reality Maze

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Virtual-Reality Maze • Project Report • August 27, 2009

  2. What’s Next Multi-Touch Screen Geography Accessories Motion Sensor

  3. Our Ideas

  4. Key Features

  5. Video here Game Demo

  6. To Implement • Bluetooth GPS / E-Compass • XML type map data • 2D / 3D maze render • Touch screen compatible • Game logic design

  7. Video here Technical Demo

  8. Any question?

  9. The End Thank you

  10. Schedule & Work Division • Aug. 8 • Render 3D scene (concise edition) • Test with Bluetooth GPS/Compass • Retrieve and process data from pedometer • Aug. 15 • Build up connection between bluetooth devices and MID • Create a new game controlling mode by using pedometer and compass • Test and optimize 3D scene in MID • Optimize GPS Data • Aug. 22 • Integration testing • Aug. 29 • Finish all project documents • Cleanup and submit project

More Related