An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Intelligent Transportation System Master Plan Update Intelligent Transportation Systems Committee November 17, 2011 Task 1: ITS Stakeholder Survey Results Prepared for: Hillsborough County Metropolitan Planning Commission (MPO) Prepared by: URS Corporation

  2. Purpose • Determine the Usefulness of Updating 2005 ITS Master Plan • Conduct Surveys of Key ITS Stakeholders • Determine and document current and future local needs, objectives and critical issues • Stakeholder perspective • Survey Results Used to Determine Next Steps

  3. Survey Process • Identified Key Stakeholders • Emailed Surveys to Key Stakeholders • Conducted Scheduled Interviews • In person • Phone conversations • Follow-up (i.e., phone calls and e-mails)

  4. Question Category 1: Given the following common transportation issues, how would you rank the severity of each issue within your community, region or area of responsibility using the scale provided (1-not a problem, 2-occasional problems, 3-general problem, 4-significant project, 5-very significant problem)? • Travel Conditions • Congestion (recurring and non-recurring) • Ramp Traffic Queuing – back onto freeway • Unfamiliar Users / Tourist Impact • Traveler Information • Lack of Adequate Alternative Routes • Notification of Major Crashes or Other Events • Accurate & Timely Information • Incident Response • Emergency / Incident Clearance Time • Emergency / Incident Response time • Lack of Communications & Interagency Coordination • Transit Systems • Lack of Roadway Conditions Information • Intermodal Transfer Options & Stop Locations • Public Transportation Accessibility

  5. Question Category 2:From your perspective what are the biggest challenges, problems, obstacles and/or areas affecting the operations, efficiency and/or safety of the transportation system in your area and/or performing and carrying out your duties? Provide any thoughts you may have on possible solutions to address these problems and/or areas.

  6. Conclusion • Based on Stakeholder Responses – There is a Need to Update the Plan! • Need Stakeholder Consensus & Champion • Determine Next Steps

  7. Next Steps • Gap Analysis – Missing Stakeholder Needs and Clarification • Obtain & Review Existing Documentation • Coordinate with the Congestion Management Process (CMP) • Develop Existing Inventory Maps • Review & Coordinate with Regional ITS Architecture • Determine Available ITS & Communications Technologies • Determine Potential Concepts & Solutions • Identify and Evaluate Potential ITS & Communications Projects • Update Regional ITS Master Plan