80 likes | 372 Vues
Intelligent Transportation System Master Plan Update. Intelligent Transportation Systems Committee November 17, 2011. Task 1: ITS Stakeholder Survey Results. Prepared for:. Hillsborough County Metropolitan Planning Commission (MPO). Prepared by:. URS Corporation. Purpose.
E N D
Intelligent Transportation System Master Plan Update Intelligent Transportation Systems Committee November 17, 2011 Task 1: ITS Stakeholder Survey Results Prepared for: Hillsborough County Metropolitan Planning Commission (MPO) Prepared by: URS Corporation
Purpose • Determine the Usefulness of Updating 2005 ITS Master Plan • Conduct Surveys of Key ITS Stakeholders • Determine and document current and future local needs, objectives and critical issues • Stakeholder perspective • Survey Results Used to Determine Next Steps
Survey Process • Identified Key Stakeholders • Emailed Surveys to Key Stakeholders • Conducted Scheduled Interviews • In person • Phone conversations • Follow-up (i.e., phone calls and e-mails)
Question Category 1: Given the following common transportation issues, how would you rank the severity of each issue within your community, region or area of responsibility using the scale provided (1-not a problem, 2-occasional problems, 3-general problem, 4-significant project, 5-very significant problem)? • Travel Conditions • Congestion (recurring and non-recurring) • Ramp Traffic Queuing – back onto freeway • Unfamiliar Users / Tourist Impact • Traveler Information • Lack of Adequate Alternative Routes • Notification of Major Crashes or Other Events • Accurate & Timely Information • Incident Response • Emergency / Incident Clearance Time • Emergency / Incident Response time • Lack of Communications & Interagency Coordination • Transit Systems • Lack of Roadway Conditions Information • Intermodal Transfer Options & Stop Locations • Public Transportation Accessibility
Question Category 2:From your perspective what are the biggest challenges, problems, obstacles and/or areas affecting the operations, efficiency and/or safety of the transportation system in your area and/or performing and carrying out your duties? Provide any thoughts you may have on possible solutions to address these problems and/or areas.
Conclusion • Based on Stakeholder Responses – There is a Need to Update the Plan! • Need Stakeholder Consensus & Champion • Determine Next Steps
Next Steps • Gap Analysis – Missing Stakeholder Needs and Clarification • Obtain & Review Existing Documentation • Coordinate with the Congestion Management Process (CMP) • Develop Existing Inventory Maps • Review & Coordinate with Regional ITS Architecture • Determine Available ITS & Communications Technologies • Determine Potential Concepts & Solutions • Identify and Evaluate Potential ITS & Communications Projects • Update Regional ITS Master Plan