An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MAI KOLACHI MAKRAN COASTAL HIGHWAY NDMA LYARI EXPRESSWAY RAN PATHANI WORK METHODOLOGY FOR REMOVAL OF COLLAPSED PORTION AT SHERSHAH BRIDGE SITE RBOD - II SUKKUR BARRAGE 25 Jun 2007

  2. NHA ACHIEVEMENTS

  3. MAJOR ACHIEVEMENTS OF FWO

  4. AIM TO PRESENT WORK METHODOLOGY FOR REMOVAL OF COLLAPSED PORTION AT SHERSHAH BRIDGE SITE

  5. KNB PROJECT DATA SALIENTS

  6. SHERSHAH BRIDGE SALIENTS

  7. REMOVAL OF COLLAPSED PORTION OF SHERSHAH BRIDGE ASSESMENT OF TASK

  8. SHERSHAH BRIDGE WORKING METHODOLOGY

  9. SHERSHAH BRIDGE WORKING ORGANIZATION • FIELD CONTROL CENTRE • (GROUP COMMANDER) • COL BASIM (NLC) • COORD OFFICER DEMOLITION GROUP – I (LT COL SAEED) DEMOLITION GROUP – II (LT COL TAHIR) SUPPORT GROUP (LT COL MANSOOR) DEMOLITION TEAM – A (IC – JCO) (2 x NCOs, 10 x OR) DEMOLITION TEAM – C (IC – JCO) (2 x NCOs, 10 x OR) COORD TEAM (IC - JCO) DEMOLITION TEAM – B (IC – JCO) (2 x NCOs, 10 x OR) DEMOLITION TEAM – D (IC – JCO) (2 x NCOs, 10 x OR) TPT / PLANT MGMT TEAM (IC – JCO) (3 x NCOs, REQ OP) TOTAL 60 – 70 PERSONS

  10. SHERSHAH BRIDGE DEMOLITION METHODOLOGY

  11. SHERSHAH BRIDGE DEMOLITION METHODOLOGY

  12. SHERSHAH BRIDGE DEMOLITION METHODOLOGY

  13. SHERSHAH BRIDGE DEMOLITION METHODOLOGY

  14. SHERSHAH BRIDGE DEMOLITION METHODOLOGY

  15. SHERSHAH BRIDGE DEMOLITION METHODOLOGY

  16. SHERSHAH BRIDGE PROPOSED LIST OF PLANT / EQUIPTMENT