1 / 19

Upgrade Plan of KEKB Vacuum system

Upgrade Plan of KEKB Vacuum system. Y. Suetsugu KEKB Vacuum Group. Contents. Challenges for vacuum system Designs for key issues Beam ducts, Flanges, RF-shielding, Cures for ECI,, Remained issues Technical General Summary. Challenges for vacuum system.

Télécharger la présentation

Upgrade Plan of KEKB Vacuum system

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Upgrade Plan of KEKB Vacuum system Y. Suetsugu KEKB Vacuum Group Contents • Challenges for vacuum system • Designs for key issues • Beam ducts, Flanges, • RF-shielding, Cures for ECI,, • Remained issues • Technical • General • Summary Pre-kickoff Meeting @ KEK

  2. Challenges for vacuum system Key parameters for vacuum system: • High current (LER:9.4 A, HER:4.1 A) • Short bunch (sz = 3 mm) • Intense SR power • Max. power density of 28 kW/m (40 W/mm2) even a half aperture of 110 mm, for example. • High photon density • Photon density ~1x1019 photons/m/s in average • Large gas desorption • Gas load ~ 5x10-8 Pa m3/s/m (forh = 1x10-6 molecules/photon) • Average pressure ~ 5x10-7 Pa for S ~ 0.1 m3/s/m • Electron Cloud Instability (ECI) becomes a big issue in positron ring • Intense HOM(higher order mode) power • For a loss factor of 1 V/pC, loss power ~ 200 kW Pre-kickoff Meeting @ KEK

  3. Present designs for key items • We have been developing key components and techniques to tackle these issues. • Beam duct • Copper beam duct with ante-chambers  Low SR power • Pumping system • Distributed pumping scheme  Effective pumping • Connection flange • Special MO-type flange  Secure RF bridge • RF shielding of bellows and gate-valves • Comb-type RFshield basically  Secure RF shield • Movable mask (collimator) • Stealth type (still under study)  Low impedance • Cures for ECI • TiN coating or (groove)  Low secondary electron yield • Clearing electrode  Direct elimination of electros Low Impedance Little photoelectron Pre-kickoff Meeting @ KEK

  4. Beam duct • Copper beam duct with ante-chambers • Copper is required to withstand intense SR power • Features (compared to simple pipe): • Low SR power density • Low photoelectrons in beam pipe • Low beam impedance • Expensive Pump Beam SR HER LER (f90) Pre-kickoff Meeting @ KEK

  5. Beam duct • Several test ducts have been installed in KEKB positron ring. • Reduction of photoelectrons was confirmed. • All ducts at arc section should be replaced. Electron numbers Straight duct ~3.6 m -30 V Circular duct 1/1284/3.77 Q-duct with BPM Duct with ante-chamber f 90 mm Pre-kickoff Meeting @ KEK

  6. Beam duct Bent duct for LER (f 90 mm) Slit for pump channel 2008.03.19 Bending and installation of slits are now under study Pre-kickoff Meeting @ KEK 6

  7. Distributed pumping system • Multilayer NEG strips in an antechamber • Increase capacity and pumping speed • Small impedance if set in an ante-chamber • Auxiliary pump: Sputter ion pump Pump Multilayer NEG strips for test (three layers) SR 12 mm Prot-type: ST-707 strip Three layers Indirect heating 1 m Heaters Pre-kickoff Meeting @ KEK

  8. Connection flange • Special MO-type flange for a beam duct with ante-chambers. • Features (Compared to usual one): • No gap inside • Sure RF bridge • Applicable to a complex aperture • Simple structure • Already applied to test beam ducts and bellows with ante-chambers. MO-type flange for bellows MO-type flange for beam duct Pre-kickoff Meeting @ KEK

  9. RF shielding Comb-type RF-shield • Comb-type RFshield • Features (compared to finger type): • Low beam impedance • High thermal strength • Applicable to complex aperture • Little flexibility (offset) • Effect of RF shielding was demonstrated in KEKB. • Finger-type as an option • If more flexibility is required. Temperature of bellows Without cooling fan Pre-kickoff Meeting @ KEK

  10. RF shielding • Already applied to bellows chambers and gate-valves, with an aperture of beam duct with ante-chambers. • They have been installed into KEKB and tested. Bellows chamber Gate-valve Pre-kickoff Meeting @ KEK

  11. Movable mask (collimator) • Big impedance sources in the ring • Planning to use “stealth” type (Ver.6) • Low beam impedance • Present Ver.4 ~ 1V/pC (f 90 mm) 200 kW power loss • Loss factor decreases to ~1/10(f 90 mm). • Manageable by conventional HOM absorber Loss factor Ver.4 Ver.4 Loss factor [V/pC] Ver.6 Ver.6 Bunch length [mm] Pre-kickoff Meeting @ KEK

  12. Movable mask (collimator) • Trial models were installed and tested with beam. • Principle was proved experimentally. • Temperature rise of bellows decreased to 1/2 ~ 1/3. • But, could not withstand a high intensity beam yet. • Start with Ver.4 ? • While beam current is low. Temperature of bellows near masks Head of Ver.6 (trial model) Beam Head Support Pre-kickoff Meeting @ KEK

  13. Cure for ECI_1 • A critical issue for positron ring • TiN coating on inner surface • Decrease secondary electron yield (SEY): Max. SEY ~0.9 • A test stand for the coating was built in KEK, and applied to a test duct with ante-chambers. • Decrease of electrons at high current region was demonstrated. Electron numbers ~4 m f 90 mm Pre-kickoff Meeting @ KEK

  14. Cure for ECI_2 • Clearing Electrode • A possible measure even inside of magnet • An electrode for test with a low beam impedance was developed, and tested. • The principle was proved experimentally. • Electrons decreased to ~ 1/10 by applying 500 V. • Under study • Grooves will be also tested. Electron numbers Clearing electrode for test Electron Current [A] Head -500V 0V +500V Applied voltage [V] Pre-kickoff Meeting @ KEK

  15. Remained issues _ Technical • Optimization of beam duct shape • CSR (Coherent Synchrotron Radiation) problem have a great effect on the luminosity. • Deformation of beam duct by heating • Displacement gauge for every BPM? Larger aperture  ---- Smaller aperture Low impedance Cure for CSR (ex, resistive wall) [Low cost?] Effective pumping (f 50) (f 90) ? Pre-kickoff Meeting @ KEK

  16. Remained issues _ Technical • Required pressure • Now 5x10-7 Pa is a goal. • First Ion Instability require lower pressure in a simulation, ~1x10-7 Pa for example. • More pumps? • Cures for ECI in magnet • Still studies are undergoing. • Clearing electrode ? Grooves? Only TiN? • Drift space: TiN coating + Solenoid will be OK. • Design of special components • Septum, Abort window, HOM absorber, Cross section, … • Design of vacuum system at IR. • IR optics is still floating. • How to keep sufficient aperture, how to deal intense SR,, Pre-kickoff Meeting @ KEK

  17. Remained issues _ General • Cost • Vacuum components are more complicated than those of other machine to achieve high current, i.e., Luminosity. • Possibility of cost-reduction are continuously considered, such as to use aluminum duct for weak SR sections (with copper SR crotch?). • Vendor • Manufacture ~2000 copper beam ducts ( 2 ~ 6 m long) in 3 years! • Find available vendors widely, all over the world. • Some R&D were performed with BINP, for example. • Installation • Install ~2000 beam ducts and bellows in 2 years! • Stored place, Installation procedure, Preparation process,, • Man power Pre-kickoff Meeting @ KEK

  18. Summary • Upgrade of KEKB is a great challenge for the vacuum system. • R&Dshave been performed for these years, and basic designs of key vacuum components is near completion. • But, various practical problems are still remained. • Any solutions should be found in this one year. • We will appreciate your corporation. 2008.03.19 Pre-kickoff Meeting @ KEK 18

  19. Pre-kickoff Meeting @ KEK

More Related