1 / 8

Public Hearings August 19, 2014

Board of County Commissioners. Public Hearings August 19, 2014. Village F PD / Magnolia Estates PSP. Case: PSP-13-09-241 Project: Village F Planned Development / Magnolia Estates Preliminary Subdivision Plan Applicant: Scott Stearns, Dewberry / Bowyer-Singleton District: 1

hertz
Télécharger la présentation

Public Hearings August 19, 2014

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Board of County Commissioners Public Hearings August 19, 2014

  2. Village F PD / Magnolia Estates PSP Case:PSP-13-09-241 Project:Village F Planned Development / Magnolia Estates Preliminary Subdivision Plan Applicant:Scott Stearns, Dewberry / Bowyer-Singleton District: 1 Acreage: 159.04 gross acres Request:Construction of 356 single-family residential dwelling units

  3. Village F PD / Magnolia Estates PSP Zoning

  4. Village F PD / Magnolia Estates PSP

  5. Village F PD / Magnolia Estates PSP

  6. Village F PD / Magnolia Estates PSP • 17. Where public gravity sewer service is proposed within mews, parks, or open space tracts, there shall be a minimum 60-foot wide clearance between vertical structures, with a stabilized access road over manholes and a utility easement over the gravity sewer main. • 18. 17. Where public gravity sewer service is proposed within mews, parks, or open space tracts, there shall be a minimum thirty-eight foot (38’) wide clearance between vertical structures, with a stabilized access road over manholes and a utility easement over the gravity sewer main. • 19.18. Wastewater gravity systems extending into the alleys shall have no more than one manhole (the terminal manhole) in the alley upstream of a right-of-way manhole, a minimum thirty-eight foot (38’) clear zone between permanent vertical structures, and a minimum twenty-six foot (26’) clear zone between fences. The gravity mains located in the alleys shall be eight inch (8”) diameter, upgraded to SDR-26 PVC pipe, and shall have a maximum of five feet (5’) of cover.

  7. Village F PD / Magnolia Estates PSP Action Requested Make a finding of consistency with the Comprehensive Plan and approve the Village F Master PD / Magnolia Estates Preliminary Subdivision Plan (PSP) subject to the conditions listed in the staff report.

  8. Board of County Commissioners Public Hearings August 19, 2014

More Related