Software organization for Phase 1
50 likes | 202 Vues
This document outlines the initiation and management of software development for Phase 1 of the ALMA (Atacama Large Millimeter/submillimeter Array) project. It covers critical aspects including European Software Advisory Committee guidelines, high-level analysis and design, integration and support from ESO (European Southern Observatory), and operations by NRAO (National Radio Astronomy Observatory). The collaboration of various software teams and their roles in control, communications, and data processing is detailed, emphasizing the importance of effective software organization, scheduling, and proposal preparation.
Software organization for Phase 1
E N D
Presentation Transcript
Software organization for Phase 1 Started Management (8.05) Glendenning/Raffi European Sw Advisory Committee Wallace Science Software Requirements (8.10) Lucas High level Analysis and design (8.15) ESO Software Engineering (8.20) ESO Common Software (8.25) ESO Integration and support (8.70) ESO/NRAO Operations (8.75) TBD Global Project Activities ALMA Software, Control & Communications
Pipeline (8.40) BIMA/NFRA/IRAM Archiving (8.45) TBD Scheduling (8.50) TBD Proposal Preparation (8.55) TBD Data Processing & Analysis (8.60) NRAO Telescope Calibration (8.65) IRAM Software organization for Phase 1 (cont.d) (From previous page) Control (8.30) NRAO Correlator (8.35) NRAO Software subsystems ALMA Software, Control & Communications
Computer architecture for prototypes ALMA Software, Control & Communications
Resources initially committed for this year (FTEs) ALMA Software, Control & Communications
The ESO ALMA Software Team • G.Chiozzi, B.Gustafsson, R.Karban, G.Raffi (TSW) • G.Filippi, J.Schwarz (IT) • F.Biancat (TEL) • M.Albrecht, P.Grosbol, (M.Peron) (DMD) • R.Albrecht (ST/ECF) ALMA Software, Control & Communications