1 / 20

New L2P and L3 at MF/CMS

Explore the process of merging, analyzing, and correcting ocean data from various sensors to ensure high-quality results with traceability. Daily updates for polar orbiters and geostationary sensors available. Enhancing accuracy for European seas analysis.

hfalkner
Télécharger la présentation

New L2P and L3 at MF/CMS

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. New L2P and L3 at MF/CMS P.LeBorgne, F.Orain, A.Marsouin, H.Roquet MF/DP/CMS, Lannion

  2. New L2P L3 • New L2P • L3 in MERSEA • From MERSEA to MyOcean

  3. Next L2P • 2009: hourly SEVIRI and GOES L2?P (at present internal to CMS/MERSEA) GRIDDED or not?

  4. Polar orbiters: • AATSR • NOAA-17 • NOAA-18 • AMSRE • TMI Analysis (L4) Synthesis + Correction L3 Other users? Data available in real time through MERSEA (ftp IFREMER) • Geostationary: • GOES-E • SEVIRI L3 at CMS: Present status in MERSEA Le Borgne et al, 2006, Mersea report

  5. Method (overview) Zone (Atl., global,..) + time window (1day, 3 days,…) Sensor i • Collection • Remapping • Synthesis over time • Correction • Principles: • Synthesize information • Best quality • Traceability at pixel level: • Origin (which sensor) • Original lat lon • Confidence level • SSES • Applied correction (if any) L3 (i), unique per sensor Merging L3 (merged)

  6. 1) Sensor-AATSR Over the last ~10 days 3) Interpolation To fine resolution: Correction of the day 2) Alalysis of the differences On a 5° grid Method : Correction

  7. Method : Merging • A priori hierarchy of sensors • traceability

  8. Buoys NOAA-17 L2Ps ……… L2Ps ..MSG L2Ps AATSR L2Ps UNCORRECTED Buoys L3 Buoys L3 NOAA-17 L3 NOAA-17 L3 ……… L3 ……… L3 ..MSG L3 ..MSG L3 AATSR L3 AATSR L3 comparison validation validation control correction comparison CORRECTED Merged L3 L3: validation overview

  9. L3: validation results over the Atlantic Routine production since 01/01/07 Validation Control

  10. L3: validation results Inter Comparison of OSI-SAF products Comparison with AVHRR18_G

  11. L3: correction validation results SEVIRI-AATSR as a function of time and latitude before correction

  12. L3: correction validation results SEVIRI-ATSR as a function of time and latitude after correction

  13. From MERSEA … • CMS MERSEA database (francoise.orain@meteo.fr) • Available in real time trough the MERSEA ftp site at IFREMER • One year completed by March 2008, • Daily collated for: • Polar orbiters: • AATSR • NOAA-17 • NOAA-18 • AMSRE • TMI • Geostationary: • GOES-E • SEVIRI • Buoys

  14. …to Myocean • MyOcean • Addition of METOP and MODIS SST • Collated down to 0.02 degree resolution • Over the European seas • For fine resolution analysis

  15. Conclusion • Correction with AATSR shows satisfying results in MERSEA • Limitations: • Cloud cover ? • Limited swath • Assumptions: large scale (several degrees)/ slowly varying (several days) errors: not right everywhere • Do need R&D effort • One full year database available next March • MyOcean: prototype in construction

More Related