1 / 17

PHILIPPINE NUCLEAR RESEARCH INSTITUTE

PHILIPPINE NUCLEAR RESEARCH INSTITUTE. Maria Celerina M. Ramiro PNRI IMS Project Team Head Susan S. Pascual Member, IMS Technical Working Group. Status of QA/IMS Implementation. Presentation Outline. About the PNRI. Nuclear Infrastructure in the Philippines. Status of PNRI QA/IMS.

hinda
Télécharger la présentation

PHILIPPINE NUCLEAR RESEARCH INSTITUTE

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PHILIPPINE NUCLEAR RESEARCH INSTITUTE Maria Celerina M. Ramiro PNRI IMS Project Team Head Susan S. Pascual Member, IMS Technical Working Group Status of QA/IMS Implementation

  2. Presentation Outline About the PNRI Nuclear Infrastructure in the Philippines Status of PNRI QA/IMS Future Plans

  3. About the PNRI Formerly the Philippine Atomic Energy Commission or PAEC National competent authority on nuclear matters Established in 1958 by RA 2067 created the PAEC with a dual mandate to promote the peaceful applications of atomic energy and regulate the use of radioactive materials Reorganized in 1987 under EO 128 PAEC was renamed to PNRI under the Department of Science and Technology Rationalization Program under EO 366 approved on 29 March 2010- Creating the Technology Diffusion Division Brief History

  4. Dual Mandate Promote the peaceful applications of nuclear energy Regulate the safe utilization of nuclear energy About the PNRI Mandate

  5. “The PNRI contributes to the improvement of the quality of Filipino life through the highest standards of nuclear research and development, specialized nuclear services, nuclear technology transfer, and efficient and effective implementation of nuclear safety practices and regulations.” About the PNRI Mission Statement

  6. DIRECTOR DEPUTY DIRECTOR PLANNING Atomic Research Division Nuclear Services Division Technology Diffusion Division Nuclear Regulatory Division Finance and Admin Division AGRI NR RSD BGT IC BMR ENG LRE ACCTG TRNG HPR IRRAD IE CASH INFO-LIB APR NATA NSS PROP BD CHEM ISOA RIA HRM-RC MIS NMR RP GS About the PNRI Organizational Structure

  7. Nuclear InfrastructureBataan Nuclear Power Plant-1 • 1976 – the contract for the PNPP was signed by the NPC and Westinghouse which provided for the NPP’s completion in mid-1983 • Government decided to mothball the plant in May 1986, and not to operate it in June 1986 • Congressman Cojuangco Bill: rehabilitation, commissioning and commercial operation of BNPP-1 • A Feasibility Study to Rehabilitate the BNPP conducted by KEPCO

  8. Nuclear InfrastructureThe Philippine Research Reactor -1 (PRR-1) • The PRR-1 began operating in 1963 • A 1 MW open-pool general-purpose General-Electric research reactor provided by the U.S.A. under the Atoms for Peace program • Shutdown in 1984-1988 to replace components to convert the PRR-1 into a 3MW TRIGA-type reactor • The PRR-1 is currently under Research Reactor Decommissioning Demonstration Project (R2D2P) of the IAEA

  9. Nuclear InfrastructureMultipurpose Co-60 Irradiation Facility • 1965-1988: Laboratory Scale • 1988-2002: Pilot Scale • 2003-present : Semi-Commercial Scale

  10. PNRI Policy Instruction 001, S. 2004 (October 7, 2004) which laid down the commitment of the PNRI to the establishment and implementation of a PNRI IMS PNRI Special Order 383, S. 2004 (October 7, 2004) creating the IMS Project Committee with the Deputy Director as Project Leader PNRI Office Order No. 5 S. 2004 (October 12, 2004) enjoining the participation of PNRI employees in the development AND implementation of PNRI IMS Regulatory arm of PNRI, NRLSD was certified to ISO 9001:2000 QMS by Certification International Phils., Inc. on November 28, 2008 Status of QA/IMS in PNRI

  11. IAEA-PNRI Workshop on IMS, March 2009 PNRI Special Order 235, S. 2009 (May 5, 2009) creating the PNRI IMS Project Team to establish the PNRI IMS based on IAEA GS-R-3 Analytical Measurements Laboratory granted ISO/IEC accreditation in July 2009 NRLSD, Regulatory Body was Certified to ISO 9001:2008 in August 2010 (transition) IMS Manual developed by the IMS Project Team currently being circulated to the PNRI Top Management for comment Status of QA/IMS in PNRI

  12. Future Plans • Finalization of the IMS Manual • Conduct of Workshops on the Preparation and Documentation of PNRI IMS • Designation of IMS Management Representatives and Document Custodians in each Division • Writing of documents by process owners (Procedures Manual, Work Instructions Manual, etc) • Implementation of the PNRI IMS • ISO Accreditation of PNRI services and Laboratories as required by the Philippine Government

  13. THANK YOU!!!MaramingSalamat!!