On July 27, 2007, JSC Uralelectromed in Kirovgrad officially commissioned its Cooling Tower and Pump Station for the Metallurgical Works. This project, executed by JSC Uralgipromez, encompassed comprehensive engineering work leading to successful completion. The turn-key contract between JSC Uralelectromed and JSC Uralgipromez highlights the collaboration in constructing key infrastructure for the Kamensk-Uralsky Metallurgical Works (KUMZ) and the Ingot Homogenization Plant, which was also completed in 2007.

hiroko
Télécharger la présentation

Civil Construction

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Civil Construction

  2. JSC Uralelectromed Kirovgrad City

  3. On July 27th, 2007 at JSC “Uralelectromed” in Kirovgrad city was put in commission “Cooling tower and pump station of Metallurgical works”. The project was performed by JSC “Uralgipromez” – starting from engineering up to successful commissioning. The “turn key” building contract was signed by JSC “Uralelectromed” and JSC “Uralgipromez”.

  4. Cooling tower

  5. Pump station

  6. Kamensk-Uralsky Metallurgical Works (KUMZ)

  7. Ingot Homogenization Plant Engineering and construction on the “turn key” basis

  8. Ingot Homogenization Plant The plant was commissioned in 2007