Tevatron Coordinator Summary, Problems, and Pending Studies
This summary provides an overview of recent maintenance and studies conducted by the Tevatron Coordinator, as well as any problems encountered and pending studies for future improvements.
Tevatron Coordinator Summary, Problems, and Pending Studies
E N D
Presentation Transcript
Supertable Tevatron Coordinator
Store Summary Tevatron Coordinator
Store Summary Tevatron Coordinator
Maintenance and Studies • B0 beam separations • C27, B47, B37, B17, A17 and A13 rough pump replaced. • C4 wet engine flying wheel replacement. Tevatron Coordinator
Problems • 6177: VB11 and VB12 tripped off during the store. Orbit stabilization took care of the orbit error. • #6179 quench caused by bad C49V power supply. • TRF8 trip => DC beam in abort gap. • C4, C3 wet engine work. • E4 cold compressor power supply fault. • Leak in BQ0 lead flow. Tevatron Coordinator
Pending Studies • Chromaticity tracker (proton only). Tan • Differential orbits (proton only). Sasha • P1 line matching (proton only). Sasha, Annala • Replacing new BLMs in all houses. • Install new 460 cards with new firmware. • Fast abort parameters adjust for LB QPMS. • CDF beam separation (EOS) Tevatron Coordinator