1 / 4
Télécharger la présentation
京都市電
An Image/Link below is provided (as is) to download presentation
Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.
Content is provided to you AS IS for your information and personal use only.
Download presentation by click this link.
While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.
During download, if you can't get a presentation, the file might be deleted by the publisher.
E N D
Presentation Transcript
京都市電 Kyotomunicipal railway
The first train in japan Length : 68.8㎞ amount of trains : 351.
History of Kyotomunciplal railway 1895.2.1 Planning begins 1904.8.4 begins operations 1916.4.25 Planning begins 1970.4.1 Inari‐Fushimi line discontinued
The last day 1970 4.1 Fushimi Inari line begins operation 1972 1.23 Senbon line, Omiya line ,sijyo-line begins operation 1974 4.1 Karasuma line discontinued 1976 4.1 Imadegawa line, Marutamachi line, Shirakawa line discontinued 1977 10.1 Kawaramachi line, Shitijyo line discontinued 1978 9.30 Kujyo line, Higashiyama line, shitijyo linediscontinued
More Related