1 / 15

AMS the Anti-Matter Spectrometer

AMS the Anti-Matter Spectrometer. The past:  1999 The present: 2000 The future: 2001-2003 and beyond… STS-91 mission (June 1998) ISS 3 year mission (May 2003?). AMS in space. the first large magnetic spectrometer i.e. the first particle physics experiment and

howe
Télécharger la présentation

AMS the Anti-Matter Spectrometer

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. AMSthe Anti-Matter Spectrometer • The past:  1999 • The present: 2000 • The future: 2001-2003 and beyond… • STS-91 mission (June 1998) • ISS 3 year mission (May 2003?) Cartigny, 12-02-2000

  2. AMS in space the first large magnetic spectrometer i.e. the first particle physics experiment and the biggest silicon system to date Cartigny, 12-02-2000

  3. AMS Physics Goals (1) • Measurement of H, He,… C isotopes • better understanding of cosmic ray origin and propagation in the galaxy • Antiprotons and positrons • search for exotic sources • High energy photons (> 1 GeV) • complementary to satellite and ground telescopes Cartigny, 12-02-2000

  4. Antimatter discovery:antistars, primordial antimatterExplanation for antimatter domain formation? No antimatter found:explanation for antimatter disappearance?Strong CP-violation? AMS Physics Goals (2) Search for antimatter: primary goal of AMS, up to |Z| = 6 Antihelium could originate from primordial nucleosynthesis OR from antistars anticarbon could ONLY come from antistars Cartigny, 12-02-2000

  5. The AMS apparatus for the precursor flight (1) • Construction and test of detector elements • assembly, integration, system tests • space qualification : outgassing, vibrations • Permanent magnet • 1.2m diameter, 80cm height, 1.9 tons • 0.15 Tesla • blocks of Nd-Fe-B of high field strength Cartigny, 12-02-2000

  6. The AMS apparatus for the precursor flight (2) • Tracker • 4 inner planes and 2 outer planespartially equipped (~40%) • 57 modules of 11 to 15 double-sided DC silicon microstrip detectors (CSEM, Neuch.) • front-end Viking/High Dynamic Range4ms peaking time, 0.7 mW/ch • 365W allocated (out of 1 kW), 0.5 Mbit/s (out of 1), 5MHz ADC on ext. TDR Cartigny, 12-02-2000

  7. The AMS apparatus for the precursor flight (3) • Time-of-flight - 4 planes • trigger • particle velocity and absolute charge • Anticoincidence - 16 counters • background rejection (albedo) • Aerogel Threshold Cherenkov - 2 planes • 168 10x10cm2 7cm thick solid cells Cartigny, 12-02-2000

  8. The STS-91 Discovery missionJune 2-12, 1998 (1) • Transport • from ETH-Zurich to Kennedy Space Center • Final tests and integration • Installation on the Shuttle Discovery • More tests and software uploads…. • Launch • Switch on and first data downloads! Cartigny, 12-02-2000

  9. The STS-91 Discovery missionJune 2-12, 1998 (2) • Data Taking • Control from Johnson Space Center • Slow Rate • temperatures, currents • counter rates, voltages • High Rate • calibrations • full events (ehm…) Cartigny, 12-02-2000

  10. The STS-91 Discovery missionJune 2-12, 1998 (3) • Landing at KSC • Transport • back to ETH-Zurich • Beam tests (+ cosmic muons…) • GSI-Darmstadt • Helium, Carbon • Cern-Geneva • charge-1 particles Cartigny, 12-02-2000

  11. Physics from STS-91 • Search for antihelium • 2,86 million helium nuclei observed • rigidity: 1 to 140 GV • Search for antimatter • Cosmic ray proton spectra • from 0.1 to 200 GeV • Gamma ray search Cartigny, 12-02-2000

  12. Mechanical design support, cooling Construction of tracker modules (ladders) Tests, metrology and integration of modules Electronic design Analysis and simulations Silicon development Environmental studies Problem analysis from STS-91 Que fait Genève? (1) Cartigny, 12-02-2000

  13. Que fait Genève? (2) • full responsibility of tracker readout system • FE electronic hybrids production & test • development of module test system • PC card, power supply (temp) • one of the three production lines of tracker modules • module integration center Cartigny, 12-02-2000

  14. AMS on the International Space Station (1) • Precursor Flight final data analysis • near completion (2000) • RD for Phase II (1999-2001) • design finalisation and optimisation • superconducting magnet • new detectors • space qualification of single elements Cartigny, 12-02-2000

  15. AMS on the International Space Station (2) • 2nd construction phase • Assembly (2000-2002) • Full space qualification • long-term operation tests • Installation on the Space Station (2003) • 3 to 5 years of data taking • (if we get He refill…) • Lots of work and physics (and fun) ahead! Cartigny, 12-02-2000

More Related