An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. The Natural Habitat of Brevard A Private Community in Rockledge, FL The Stormwater Management System Prepared for: Mr. Fran Lemieux

  2. Scope of the Project: • To design and construct a stormwater management system fora 25 year/24 hour SCS Type III Florida Modified Storm Event in a newly developed 12.37 acre community located in Rockledge, FL off of Roy Wall Blvd (Brevard County). • Components of the Project: • 1. To design a stormwater management system (SMS) • 2. To prepare a construction schedule for the project • 3. To prepare a cost estimate for the project • 4. To provide a quality control plan • 5. To provide a budget control plan • 6. To develop construction contracts and terms

  3. The Project Management Plan: • Design • Stormwater Management System • Project Controls • Construction Schedule • Cost Estimate • Quality Control • Budget Control • Legal • Codes, Permits, Licenses, and Agencies

  4. Client Goals: • 1. To construct a quality residential development • 2. To alleviate flooding in the development and preserve the development’s natural • habitat • 3. To create an efficient stormwater management system within the community with • two aesthetically-pleasing large ponds • 4. To finish the project on time • 5. To make a profit

  5. The Stormwater Management System consists of: • Inlets • Pipe/Swale Network System • Wet Retention-Detention Ponds • Outlet Structure • The Constraint: • Post-Development Conditions must be less than or equal to Pre-Development Conditions

  6. The Pre-Development Conditions: Site Before Design Hydrograph

  7. The SMS Design: • – 32 Lots (0.2 acre per lot) • – Preserve/Landscaped • Area • – 2 Wet Retention/ • Detention Ponds • – 10 Inlets (14 subareas) • – 1722 ft of SW pipe used • – Weir/Orifice Design • Site After Design

  8. The Post-Development Conditions to the Ponds: Hydrographs

  9. The Post-Development Conditions through the Ponds: Hydrographs

  10. The Benefits: • Contaminated runoff water within the site will be treated by the two ponds as well as • the five swales and be released to the outfall location as clean water • The lots will have a great backyard view of two large bodies of water • The lots will provide more waterfront than most communities in Brevard County • There will be more wildlife preserve than any community in Brevard County • It will be a private-gated community to make everyone feel safe and secure at all times

  11. The Project Construction Schedule:

  12. The Project Construction Cost Estimate:

  13. The Quality Control Plan: • To maintain standards in every project by: • Inspecting • Analyzing • Taking Action • to make sure our product is always of the highest quality.

  14. Inspections = 3 Phase System: • Initial Inspection – 1 to 2 weeks prior to task to ensure plans, equipment, materials, methods will be ready • Pre-Inspection – day of task, but prior to construction to ensure all components are in place and according to spec • Post-Inspection – after construction, to ensure task meets specs, prior to • acceptance and payment • Analyze: • Review inspections • Review lab data • Take Action • Verbal corrections on the spot • Follow-up in writing • Do not pay until corrected

  15. The Budget Control Plan: • The budget control graph is our primary tool • Pay for: • Work Completed • Materials on Site • Change Orders

  16. The Project’s Codes, Permits, Licenses, and Agencies: • Codes • The following codes will be implemented during the design/construction process: • Storm Water Management Criteria (Code of Ordinances of Brevard County) – • Volume II, Chapter 62, Article X, Division 6 • Storm Water Management (Melbourne City Code) – Storm Water Ordinance, Chapter 27, Article I • Regulation of Storm Water Management Systems (St. John’s River Water Management • District) – Chapter 40C-42, F.A.C. • Permits and Licenses • Acquire necessary permits and licenses to complete task • Agencies • Maintain a good relationship with agencies and public

  17. The Project Summary: • Post-Development conditions are less than or equal to Pre-Development • The SMS will mitigate flooding within the development and preserve habitat • The two ponds will be very large and aesthetically pleasing • The construction schedule will ensure the project will be completed on time • The budget control plan will ensure the cost estimate will be enforced • A quality development will be achieved by following our quality control plan • Client’s needs are satisfied and Shaw makes a profit on the venture!

  18. Thank you from The Shaw Group, Inc. • If you have any questions regarding our work, please • contact me at: • Stephen Kozlowski • (603) 677-2566 • skozlowski2008@my.fit.edu