An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Bill of Materials Janean F. Lulloff Business Management 361 Section 1 Dr. Foster Marriott School Brigham Young University

  2. Contents of Tutorial • Definition of a bill of materials • How a bill of materials is used • Types of bill of materials • Bill of materials information • Benefits of a bill of materials • Examples of bill of materials

  3. Definition Bill of Materials (BOM) • A listing of all the subassemblies, intermediates, parts, and raw materials that go into a parent assembly showing the quantity of each required to make an assembly. Bozarth, Cecil C. and Handfield, Robert B. Introduction to Operations and Supply Chain Management . Pearson Education, Inc., Upper Saddle River, New Jersey, 2006. p.461.

  4. Definition Explained • Basically, a bill of material (BOM) is a complete list of the components making up an object or assembly. • It is also part of material requirements planning (MRP)

  5. Processes that utilize a BOM • Production • Materials planning • Product costing • Plant maintenance

  6. How can a BOM be used in your organization? • Several software programs are available that store item information and prepare bill of materials automatically

  7. Types of BOMs • Static (fixed) bill • A bill of material for a part that is normally made from the same components, labor and raw materials. • Used for standard assemblies, components, and engineer-to-order customer orders. • Example: • A bill of materials for a standard chair

  8. Types of BOMs • Dynamic (parametric) bill • A bill of material for a product or part for which size, color, laminate, and other options can be selected. • Example: • A bill of materials for a Dell computer

  9. Types of BOMs • Single level bill of material • A bill of material that lists the materials, parts and labor required to make another part. • Example: • A bill of materials to make a Dell computer

  10. Types of BOMs • Multilevel bill of material • A bill of material that lists the components, assemblies, and materials required to make a part, the components, assemblies, and materials required to make each component and assembly of the part, and so forth. • Example: • A BOM for the battery inside the Dell computer.

  11. Structure of a BOM

  12. What information is on a BOM? • Quantity • Item ID# • Description of Item • Cost of Item • Total Project Cost

  13. Quantity • Tells user how many of each part is needed for each project • Example: • A chair needs 1 seat, 4 legs, 1 back, and 5 nails.

  14. Item ID # • Tells us which part to order • Can be any of the following: • Catalog number, UPC, or any other identification number. • Example: • The chair needs a 2PC seat, 5DR legs, 6TU8 back, and 1 inch nails.

  15. Description of Item • Provides a check that the correct item is being ordered.

  16. Cost of Item • Cost is included to show how much each part is per item and the total cost of all like parts. • Example: • The cost of a leg is $5 per leg. Then the total price of the legs ordered would be $20 because there are 4 legs.

  17. Total Project Cost • Shows the total cost of all items and is also the total cost of the direct materials used in the project. • Example: • Seat-$10, Back-$5, Leg-$5 per leg, Nail-$.5 per nail • Total Cost of a chair = 10 + 5 + 5*4 + .5*5 = $37.50

  18. Benefits of a BOM • Optimize engineering, planning and purchasing efforts by providing centralized and up-to-date information in Make-To-Stock, Repetitive, JIT or Job Shop environments. • Improve material management by responding to changes in production. • Reduce inventory levels and obsolete parts. • Reduce manufacturing costs.

  19. Benefits of a BOM • Minimize clerical and engineering efforts by optimizing the tasks of maintaining and changing multi-level bills. • What-If capabilities for estimating or quoting. • Supports variable length part numbers and unlimited descriptive text. • Easy methods for accessing part information

  20. BOM Example Quantity ID# Description Unit Price Total Cost 1 6TU8 Back $5/Unit $ 5.00 4 5DR Legs $5/Unit 20.00 1 2PC Seat $10/Unit 10.00 5 1” Nails $0.50/Unit 2.50 Total Project Cost $37.50

  21. BOM Example 161kV H-Frame Tangent QuantityCatalog No. Description 2   70-foot Wood Pole 1 DP1-457-156-156 Crossarm Shop Assembly • DP1-457-156-156W Crossarm, 3-5/8" x 9-1/2" x 32'-0", Laminated 3 5860-3545 Adjustable Spacer Filling Assembly, 8-3/4" to 12-3/4“ 6 W4104-4S Bolt, Washerhead, 1/2" x 10- 1/2", SN 12 W5050-3S Bolt, Washerhead, 5/8" x 5", SN 1 41058BS Bolt, Bent Double End 7/8" x 8", 2SN, 2MF 2 41058BB Bolt, Bent Machine 7/8" x 6", SN, MF  

  22. BOM Example Project Bill of Materials Pine Lake HomeSites Cost Item Quantity Cost/Item Total $  Site Development Clearing & Grading 1.00 Each 59,429.00 59,429.00  Paving 1.00 Each 114,549.00 114,549.00  Curb & Gutter 1.00 Each 64,232.00 64,232.00  Sanitary Sewer 1.00 Each 158,810.00 158,810.00 Storm Sewer 1.00 Each 61,277.00 61,277.00  Water 1.00 Each 63,602.00 63,602.00 Entrance 1.00 Each 36,000.00 36,000.00 Power & Street Lighting 1.00 Each 9,300.00 9,300.00 Amenity 1.00 Each 270,000.00 270,000.00 Contingency 1.00 Each 35,000.00 35,000.00 Total Site Development   $872,199.00   

  23. Screenshots of BOM Software

  24. Screenshots of BOM Software

  25. References • Bozarth, Cecil C. and Handfield, Robert B. Introduction to Operations and Supply Chain Management. Pearson Education, Inc., Upper Saddle River, New Jersey, 2006. p.461. • help.sap.com/saphelp_40b/helpdata/en/cd/daf2cd4ab011d18a0f0000e816ae6e/content.htm • www.grms.com/BillsofMaterial.htm • www.feldmanengineering.com/BoM_Glossary.htm • www.brooksmfg.com/bom.html • www.planease.com/samples/unitsales/projectbill.htm