Upcoming Beam Batches and Conditioning Status for LHC - Action Required by Friday Morning

We are currently managing several beam batches with specific readiness and outgassing conditions. The .25nsec batch comprises 2 batches with intensity of 1 to 1.2e11 eH/V, ready since 11/3, although H2 remains unchecked, while MKE4 is still outgassing. The 50nsec single batch from PSB is ready with an intensity of 1.35 to 1.45e11 eH/V, having been prepared since 18/3, with MKE4 outgassing. A double batch from the booster is ready in PS. Prioritize conditioning of TIDV and MKDH so we can inform LHC by Friday morning about the weekend's expectations.

ilario
Télécharger la présentation

Upcoming Beam Batches and Conditioning Status for LHC - Action Required by Friday Morning

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 25nsec 2 batches Bunch int. : 1 to 1.2 e11 eH,V= 3.3 to 3.5 mm Ready since 11/3 H2 not checked, MKE4 still outgassing.

  2. 50 nsec Single batch from PSB: 4 batches Bunch int. : 1.35 to 1.45e11 eH,V= 2.4 mm Ready since 18/3 MKE4 still outgassing with 4 batches. Double batch from booster is ready in PS

  3. PLAN Start ASAP on Thursday evening, check conditioning of TIDV and MKDH such that by Friday morning we will be able to inform LHC what they can espect for the weekend.