As we approach the end of the year, there are critical immediate resource needs to support current engineering projects. Specifically, we require the assistance of 2 mechanical engineers (MEs) experienced in door surrounds and an additional ME with frame installation expertise. Current staffing levels will not suffice to meet the planned release schedules. There are updates needed for Everett tracking logs, and we've missed several red line dates. Addressing these resource gaps is essential to ensure project completion and alignment with deadlines.
E N D
-9 AFT Recovery • Layouts (13) • Final Due by EOY – X Total • X are supported by current staffing • Xresource help needed for systems/ducting • Approved Due by EOY – X Total • X are supported by current staffing • X resource help needed for doors • X held for Engineering
-9 AFT Recovery • ME Review/Signoffs (109) • Structures • 0 are due by EOY • X are complete and need to updated in Everett tracking log • X will close with current staffing • X have been reviewed and waiting on pickup feedback from DE • X have/will missed red line date • X resource help needed
SOW for Immediate Help Needed Need 2 MEs familiar with door surrounds to assist with these layouts and ME Review/Signoffs
SOW for Immediate Help Needed, cont’d Need 1 ME (familiar with frame installation preferred) to assist with these OPF ME Review/Signoffs until LCPT can get mobilized to take on this work.
Immediate Help Needed • Need total of x immediately to support current release schedule • x to support door surrounds (Andrew Wildrick) • x to support OPFs (Ed Pylant, Abe Ortiz)