Factors to Consider in Innovative Contracting

Factors to Consider in Innovative Contracting. Doyt Bolling and Jared Holland Utah Technology Transfer Center. Innovative Contracting. The primary goal of Innovative Contracting is to provide timely delivery of a quality project or facility with limited User & Social Impacts.

iola
Télécharger la présentation

Factors to Consider in Innovative Contracting

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Factors to Consider in Innovative Contracting Doyt Bolling and Jared Holland Utah Technology Transfer Center

  2. Innovative Contracting • The primary goal of Innovative Contracting is to provide timely delivery of a quality project or facility with limited User & Social Impacts. • User & Social Impacts- Costs incurred by the road user or public that are not directly accounted for in Traditional Contracts.

  3. Factors • Third Party Conflicts • Project Complexity • Availability of Funds • Time Constraints • Road User Impacts • Product Quality

  4. Third Party Conflicts • Utilities • Environmental • Political Legal * Innovative Contracting should not be used in any case where a third party conflict exists.

  5. Project Complexity • Routine • Complex Design • Complex Construction • Technical Integration

  6. Availability of Funds • Emergency Project • Timing of Funds • Local, State, Federal • Bonding • Toll Fees

  7. Time Constraints • Event • Emergency • Public Perception • Limited Resources

  8. Road User Impacts • High Accident Rates/Safety in Work Zones • Impact to Businesses • Traffic Control • High Road User Costs (Delays, Inconvenience) • Air Pollution

  9. Product Quality • Smoothness • Extended Service Life • Maintenance Objectives • Improved Serviceability

  10. Contracting Procedures • Traditional Contract (Design-Bid-Build) • Design-Build • A+B Bidding • Lane Rental • Warranty • Job Order Contracting

  11. Traditional Contracts • Projects with Third Party Conflicts • Cookie Cutter Projects • Projects with Negligible Impacts to the Road User, Public, & Environment • Projects with Potential Risks

  12. Design-Build • Decrease Time (Emergency/Event) • Complex Design • Complex Construction • Technical Integration • Limited In-house Resources • Projects Procured Just-In-Time

  13. A+B Bidding • Decrease Time (Emergency/Event) • Potential for High Road User Cost • Potential Impact to Local Businesses • Public Perception • Vital Corridor

  14. Lane Rental • Decrease Time (Emergency/Event) • Potential for High Road User Cost • Potential Impact to Local Businesses • No Alternative Routes • High ADT

  15. Warranty • Projects in which Performance can be Measured • Minimize Overall Life-Cycle Costs • Project Conditions are Well-Defined • Incorporation of New Technology in Materials, Equipment, and Construction Processes

  16. Job-Order Contracting • Routine Projects • Reduce Administrative Costs • Projects Procured Quickly (JIT)

  17. Contractor Control • In order for Innovative Contracting to be successful in a project, the contracting firm must have control over the variable the owner wishes to minimize/maximize.

  18. Early Assessment of Innovative Contracting Practices (Trauner)

  19. Design-Build

  20. A+B Bidding

  21. Lane Rental

  22. Warranty

  23. Job-Order Contracting

  24. Innovative Contracting Website Access • Accessing WebSite • Connect to www.utaht2.usu.edu • Click on the Innovative Contracting Link. Or • Go directly to the Innovative Contracting Page by entering http://www.utaht2.usu.edu/IC/Default.html • Viewing Documents • Click on the Link “Search for Innovative Contracting Documents”. • Then use the pull-down menus to select a “state” and a “contracting procedure”. NOTE: to view all leave the pull-down menus blank. • Click Run Query • After the query loads click on the title of the document you wish to view. • A full description of the document will load. • Click on “View Full Document” at the bottom of the page. • If you have Adobe Acrobat Reader the document will load. Or • If you do not have Adobe Acrobat Reader, click on the icon, or visit www.adobe.com/prodindex/acrobat/readstep.html to download a free copy. • Also, utilize the website for other information on innovative contracting practices. It includes links, basic definitions, and the draft of “Best Practices Management Guidelines for Innovative Contracting.