1 / 4

Industrial Storm Water Permit

Industrial Storm Water Permit. 2011 Reissuance CA State Water Resources Control Board. Industrial Permit Timeline. 1991 – (modified in 1992) first IGP Order  April 1997 – Order 97-03-DWQ (current permit) Adopte 2003-2005 – Prior draft IGP process 2005-2006 – Expert panel on numerics

iona
Télécharger la présentation

Industrial Storm Water Permit

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Industrial Storm Water Permit 2011 Reissuance CA State Water Resources Control Board

  2. Industrial Permit Timeline • 1991 – (modified in 1992) first IGP Order  • April 1997 – Order 97-03-DWQ (current permit) Adopte • 2003-2005 – Prior draft IGP process • 2005-2006 – Expert panel on numerics • January 2011 – Released draft IGP • Summer 2011 – Reviewed comments, met with stakeholders, etc. • Fall/Winter 2011 – Plan to release a new, draft IGP

  3. January 2011 Draft • Contained numeric action levels (NALs) and numeric effluent limitations (NELs), based on USEPA benchmark values • Increased sampling • Increased minimum BMPs • Included a progressive response framework • No exposure certification (NEC) and other, conditional exclusions were included

  4. January 2011 Draft (cont.)

More Related