An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Smart metering update 4 August 2011 Andrew Neves 1 | Energy Networks Association - DCMF

  2. Overview 4 August 2011 2 | Energy Networks Association – DCMF • Government is pushing smart metering as a key part of its climate change policy • Department of Environment and Climate Change (DECC) is leading, and has established large team in Whitehall • Many work groups and sub-groups have been established, including a ‘hot house’ to finalise meter specifications • Both Energy Retail Association (ERA) and Energy Networks Association (ENA) are very active • Roll out by 2014 for profile class 5-8 customers, and 2020 for remaining non half-hourly customers • 50 million meters to be replaced (gas and electricity)

  3. Smart Meters Programme: Stakeholder & Industry Advisory & Working Groups SRO Design Authority Programme Director PMO DECC Smart Meters Projects Ministerial Implementation Co-ordination Group Implementation Co-ordination Group Overall Design Advisory Group (ODAG) Smart Meters Design Group (Alan Claxton ENA) Business Requirements & Process Re-design Privacy Advisory Group Security Technical Expert Group DCC Group Consumer Advisory Group Roll-out & Consumer Engagement Group DECC Smart Meters Advisory Groups Planning Delivery and Operations Group (PDOG) User Requirements Specification DCC Licensing & obligations DCC Procurement Strategy DCC Smart Energy Code Roll-out operational issues Consumer Engagement ESoDR* HAN Home Area Network IHD In Home Display Architecture DCC Cost Recovery / Incentives/ charging DCC Cost adoption criteria & values DCC Roles & at customer premises Benefits Realisation Tarriffs Installation & Maintenance Micro-generation Application Layer Privacy & Data Access Pre Payment Meters PPM Difficult Property Types Normative references Use Cases DCC Licence Applications Regulations WAN User Requirements DCC Non-Domestic issues Elec Meter Varianrts Gas Meter Variants Gas meter battery life Data modelling Consequential changes – codes & licences Access to Data Inter-operability *ESoDR = extended Statement of design Requirements DECC Smart Meters Working Groups

  4. Data from smart meters 4 August 2011 4 | Energy Networks Association – DCMF Data Communications Company (DCC) will be established to communicate with all domestic smart meters on behalf of industry parties DCC will not have a monopoly for non-domestic meters Smart meters will measure and hold ‘period consumption’ Significant privacy issues around which parties see what granularity of consumption data Smart meters will provide many types of alerts (e.g. power lost, terminal cover open, maximum demand exceeded, etc.) Strict rules (as yet unspecified) will govern which parties can program meters or receive alerts and data

  5. Implications for DUoS charges 4 August 2011 5 | Energy Networks Association – DCMF Supplier tariffs likely to become more diverse and dynamic This may make ‘de-linking’ increasingly attractive? Profile class 5-8 customers will be early movers to smart metering – see ‘P272’ and ‘DCP103’ Move from profiled NHH data to ‘real’ profiles brings potential for more focused DUoS price signals Site-level billing of all DUoS may be feasible – but very significant issues surround this Tony McEntee floated some ideas at the last meeting DCMF should build on these and start debating options