Latest issues stem from RFT module losing phase lock. Efforts to secure a "real RF" connection at MI-10 are underway, including potential bucket delay retiming. Integrator timing for TeV E11 gate needs checking post re-timing for fly spec 2. Scheduled pre-injections and P-Bar injections need attention. Support required for new wire setup at A0, including cables, computer, VME chassis, motor control hardware, PMT power supply, software, and database changes.
Troubleshooting RFT Module Phase Lock & Integrator Timing Update
E N D
Presentation Transcript
MFW • Latest problems stem from RFT Module loosing phase lock. • Greg Vogel informs us that the “real rf” is available in MI-10 since they ran optical fiber. • I will attempt to get a Real 53 MHz connection for the RFT at MI-10. • May need to retime the bucket delays.
TFW So Far • Have re-timed in all three wires for fly spec 2 • Need to check on flies in shot • 17 pre-injection, p-bar injection tune-up • 22 proton injection • 3 P-Bar injection • 30,31,32,33 flies up the ramp • 1 start of HEP
36 bunches in Tev Unfortunately the PMT is not Powered
Support For new Wire at A0 • Need • New Cables to Tunnel • New Computer • New VME Chassis • New Motor Control Hardware • PMT Power Supply • Software • Minor modifications to generic FW code • Database Changes