120 likes | 209 Vues
Latest issues stem from RFT module losing phase lock. Efforts to secure a "real RF" connection at MI-10 are underway, including potential bucket delay retiming. Integrator timing for TeV E11 gate needs checking post re-timing for fly spec 2. Scheduled pre-injections and P-Bar injections need attention. Support required for new wire setup at A0, including cables, computer, VME chassis, motor control hardware, PMT power supply, software, and database changes.
E N D
MFW • Latest problems stem from RFT Module loosing phase lock. • Greg Vogel informs us that the “real rf” is available in MI-10 since they ran optical fiber. • I will attempt to get a Real 53 MHz connection for the RFT at MI-10. • May need to retime the bucket delays.
TFW So Far • Have re-timed in all three wires for fly spec 2 • Need to check on flies in shot • 17 pre-injection, p-bar injection tune-up • 22 proton injection • 3 P-Bar injection • 30,31,32,33 flies up the ramp • 1 start of HEP
36 bunches in Tev Unfortunately the PMT is not Powered
Support For new Wire at A0 • Need • New Cables to Tunnel • New Computer • New VME Chassis • New Motor Control Hardware • PMT Power Supply • Software • Minor modifications to generic FW code • Database Changes