1 / 17
OTR TYRE MOUNTING
260 likes | 639 Vues
OTR TYRE MOUNTING. PROCEDURE. 1. Rim assembly. 2. Soap solution applied on rim. 3. Soap solution applied on tyre bead. 4. Carry the tyre with tyre handler. 5. 6. Lay down the tyre inside rim drum. 7. Top flange fixed on rim. 8.
Télécharger la présentation
OTR TYRE MOUNTING
An Image/Link below is provided (as is) to download presentation
Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.
Content is provided to you AS IS for your information and personal use only.
Download presentation by click this link.
While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.
During download, if you can't get a presentation, the file might be deleted by the publisher.
E N D
Presentation Transcript
OTR TYRE MOUNTING PROCEDURE
1 Rim assembly
2 Soap solution applied on rim
3 Soap solution applied on tyre bead
4 Carry the tyre with tyre handler
6 Lay down the tyre inside rim drum
7 Top flange fixed on rim
8 Bead seating ring fixed between tyre bead and rim drum
9 Bead seating ring fixed between tyre bead and rim drum
10 Lock ring fitment
11 Lock ring fitted tyre
12 'O' Ring fitment
13 'O' Ring fitment
14 All Assembly fitted tyre
15 Air Pressure filling in mounted tyre
More Related