An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Generic Operational Safety Assessment (GOSA) Workshop on the Application of the IAEA Methodology and Safety Assessment Framework (SAFRAN) Tool for the Safety Case (SC) and Safety Assessment (SA) for Predisposal Management of Disused Sealed Radioactive Sources (DSRS) Athens, GREECE 23-27 June 2014

  2. Assessment Context • The assessment context of the GOSA should be consistent with the generic safety assessment (GSA) for borehole disposal (IAEA Safety Series Report: Generic Post-Closure Safety Assessment for Borehole Disposal of Disused Sealed Sources)

  3. Purpose • The purpose of the GOSA is to demonstrate that the proposed pre-disposal waste management activities for DSRS are done in a safe manner, as required by the regulatory framework. • The safety of operators (workers) and members of the public will be assessed, both for normal operations and for potential accidental situations.

  4. Scope • The starting point for the GOSA is that the Disused Sealed Sources (DSSs) have arrived at the site • Activities of the original producer [e.g. hospital] and transport to site are beyond the scope of the current project). • The DSRS will be either disposed using the BDC or other disposal options (e.g. disposal in a near-surface or deep facility) and management options (long-term storage) will be used, but this assessment is limited to the pre-disposal phase.

  5. Inventory to be considered • The inventory (Bq) and number of sources to be assessed in the GOSA need to be representative of what is found in practice in different countries. • An initial proposal was to consider two cases: a country (Ghana being an example) with a low to medium inventory of relatively low level activity sources that do not require the use of hot cells, and a country (South Africa being an example) with a medium to large inventory which includes high activity sources that will require the use of hot cells. • Different initial states of the sources are considered, including sources in the original devices, in a transport package, in the working container, and conditioned in cement.

  6. Regulatory Framework • IAEA Safety Standards are used as the basis for the regulatory framework. • This includes normal operation and accidental situations, taking into account dose constraints as well as dose limits. • One issue currently under evaluation is the calculation of doses to the eye, extremities, etc., in addition to whole body doses.

  7. Typical activities for High activity sources and their duration

  8. Examples of accidental scenarios (hot cell) • The situation where the operation team is unaware that the source has an activity greater than the value for what the facility was designed for and the team proceeds with standard operations. • Error during the determination of the density of the shielding material (sand) in the hot cell and the operation proceeds with a sand density below design requirements. • Situation with the ZnBr2 window density below design requirements being used by the operation team. • Source is dropped after being removed from the original source shield. • The source is found to be leaking when removed from the original source shield inside the hot cell. (Could have been damaged during removal). • The manipulators malfunction whilst the source is inside the hot cell. • The biological shield is damaged while bringing in the original source shield. • Power outage in the hot cell. • Lights are not operational in the hot cell.