1 / 3

AIDA 8.5.3 meeting D.Boscherini 13/05/2011

AIDA 8.5.3 meeting D.Boscherini 13/05/2011. Assign items to institutes Appoint responsible for each item Priority list: which item(s) to drop if funding not enough. AIDA 8.5.3. AIDA 8.5.3 planning. Milestone at 31/07/2012: Design of GIF++ infrastructure via activity report

ivan
Télécharger la présentation

AIDA 8.5.3 meeting D.Boscherini 13/05/2011

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. AIDA 8.5.3 meeting D.Boscherini 13/05/2011 • Assign items to institutes • Appoint responsible for each item • Priority list: which item(s) to drop if funding not enough

  2. AIDA 8.5.3

  3. AIDA 8.5.3 planning • Milestone at 31/07/2012: Design of GIF++ infrastructure • via activity report • Next meeting? • Please, ask the AIDA members from your institute to register on • http://aida.web.cern.ch/aida/about/register/

More Related