Constellation Status, Plans for Future Manfred Bester University of California - Berkeley

Constellation Status, Plans for Future Manfred Bester University of California - Berkeley. Overview. Overview Prime Mission Constellation Status Science Operations Maneuver Summary Fuel Budget Extended Mission ARTEMIS Concept of Operations Top Level Schedule Network Communications

jack
Télécharger la présentation

Constellation Status, Plans for Future Manfred Bester University of California - Berkeley

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Constellation Status, Plans for Future Manfred Bester University of California - Berkeley

  2. Overview • Overview • Prime Mission • Constellation Status • Science Operations • Maneuver Summary • Fuel Budget • Extended Mission • ARTEMIS Concept of Operations • Top Level Schedule • Network Communications • Roles and Responsibilities • Navigation Plans • Summary of Future Plans

  3. Prime Mission Time History of Events and Macroscale Interactions during Substorms (THEMIS) NASA Medium-class explorer mission Managed in PI Mode by UCLA/UCB http://themis.ssl.berkeley.edu http://www.nasa.gov/themis 5 Probes in synchronized Earth orbits with periods of 4, 2 and 1 days Conjunctions are formed in magnetospheric tail every 4 days

  4. Successful Launch Campaign Launch: February 17, 2007 Probe Release: L + 70 min Responsibility for Constellation Operations Transitioned to MOC at UCB

  5. Prime Mission Status Summary • Prime Mission Status • Completed LEOP, coast phase, tail 1 and dayside 1 • Upcoming tail 2 and dayside 2 seasons • Answered primary scientific questions already • Constellation Status • All probes very healthy and collecting science data • Fuel reserves allow for ambitious mission extension • Ground Systems & Operations Status • All ground systems processing nominally • Executed 248 individual thrust operations to date • Completed 10,000 passes on December 3, 2008 • All routine passes supported in lights-out mode

  6. Constellation Status Page

  7. Science Operations • Science Instrument Commanding • Configuration changes discussed in ops meetings • All instruments command sequences typically tested on FlatSat prior to upload • Ops team implemented 75 ICCRs to date • Science Data Recovery Metrics • Data dumps near perigee at 512K or 1024K • Outer probes get two passes whenever possible • Recovered / acquired data volume: 98 - 99% • Recovered / required data volume: 111 - 147% • Tohban monitors data quality and completeness

  8. Flight Systems Status

  9. Anomaly Tracking • Anomaly Tracking & Resolution • Tiger Team assigned for each flight system or major ground system anomaly • Investigate and determine cause of anomaly • Recommend solutions, work-arounds and/or mitigations • Provide final report • Anomaly Tracking List • Items closed out when anomaly report released and recommended actions were performed • Currently tracking 29 items (20 closed)

  10. THEMIS Orbit Determination • Orbit determination (OD) for the THEMIS constellation is based on two-way Doppler tracking data and the Goddard Trajectory Determination System (GTDS). • Tests are underway to characterize the THEMIS ranging capabilities for use during ARTEMIS.

  11. Executed Maneuver Summary * ARTEMIS Probes Total executed thrust operations: 248

  12. P1 Large Plane Change Maneuver ΔV: 296.5 m/s Fuel: 13.2 kg

  13. P2 Large Plane Change Maneuver ΔV: 227.7 m/s Fuel: 10.5 kg

  14. P1 Planned Maneuvers • * Spin target is 20.2105 ± 0.0130 rpm

  15. P2 Planned Maneuvers • * Spin target is 20.2105 ± 0.0130 rpm

  16. P1 & P2 Remaining Fuel

  17. Extended Mission Time History of Events and Macroscale Interactions during Substorms (THEMIS) 3 Probes (A/P5, D/P3, E/P4) in synchronized Earth orbits with 1-day periods Acceleration, Reconnection, Turbulence and Electrodynamics of the Moon’s Interaction with the Sun (ARTEMIS) 2 Probes (B/P1, C/P2) in lunar orbits

  18. ARTEMIS ConOps • ARTEMIS Concept of Operations • Transfer of outer two probes (B/P1 and C/P2) into lunar orbits via Weak Stability Boundary trajectory using Earth and lunar gravity assist • Communications with these two probes via DSN • Data recovery from lunar distances up to 128K • Attitude determination with sun sensor data only • No required flight software changes • THEMIS Concept of Operations • THEMIS mission continues with inner three probes (A/P5, D/P3, E/P4) in tighter formation NOTES: For all operational purposes all five probes shall continue to be referred to as THEMIS A-E. New capabilities at the MOC shall be considered an upgrade, not a transition.

  19. Network Communications THEMIS Probes TDRS GDSCC DSS-24, 27 CDSCC DSS-34, 45 MDSCC DSS-54, 65 WS1, AGO, MILA, WGS JPL DSN BGS Secure Intranet White Sands Complex USNHI, USNAU USN NMC GSFC NMC Open IONet T1 Line Isolated Dial-up ISDN Line THEMIS/ARTEMIS Network Links Berkeley Multi-mission Operations Center HBK

  20. Spacecraft Constraints

  21. Thruster Firing Modes

  22. Roles and Responsibilities • ARTEMIS Navigation Team • Mission Design & Baseline Trajectories • JPL/GNC • Trajectory Verification & Validation • GSFC/FDAB • Navigation Plans & Error Analysis • GSFC/FDAB • Maneuver Targeting & Operations • GSFC/FDAB & UCB/SSL • Orbit Determination & Error Analysis • GSFC/FDF & UCB/SSL • Attitude Determination • UBC/SSL with software provided by GSFC/FDAB and a.i. solutions

  23. Top Level Schedule

  24. P1 Impulsive ORM Sequence THEMIS D2 ORM 1 ORM 8

  25. P1 Lunar Approaches

  26. Navigation Work Flow Finite Trajectory Design JPL/NAV Orbit Determination Predictive Ephemeris GSFC/FDF Maneuver Operations UCB Ephemeris Products Telemetry Data Initial Trajectory Maneuver Planning GSFC/FDAB Maneuver Reconstruction UCB Trajectory Verification and Correction GSFC/FDAB GMAN/GMAT Config Post Execution State Validated Trajectory Maneuver Verification UCB Orbit Determination Definitive Ephemeris GSFC/FDF Ephemeris Products Thruster CMD Sheets Acquisition Data Planning Products Maneuver Calibration GSFC/FDAB & UCB

  27. Summary • Near Term Plans • Complete second tail season by April 2009 • Outer probes maneuvered close to neutral sheet • Finalize ARTEMIS mission design • Mid Term Plans • Complete second dayside season by July 2009 • Start orbit raise maneuver sequence for P1 & P2 • Long Term Plans • Execute translunar trajectory phase for ARTEMIS (P1 & P2) • Operate THEMIS (P3, P4, P5) in closer formation

  28. Going Back to the Moon Launch: July 16, 1969 Landing: July 20, 1969 40 Years Later …